Samson 41-23 Series Mounting And Operating Instructions Download Page 2

SAMSON AG · MESS- UND REGELTECHNIK
Weismüllerstraße 3 · 60314 Frankfurt am Main, Germany
Phone: +49 69 4009-0 · Fax: +49 69 4009-1507
[email protected] · www.samson.de

EB 2595 EN

2015-08-18 · Engl

ish

Operation

Proceed as follows:

 

Unscrew the filler plug on the chamber 
and undo the vent screw on the dia

-

phragm actuator.

 

For applications with steam: use the sup

-

plied plastic funnel or a watering can to 
fill the chamber with water until it over

-

flows at the vent hole on the actuator.

For applications with other 

liquids

, fill the 

compensation chamber with the process me

-

dium.

 

Screw the filler plug back on the cham

-

ber and tighten.

1  Application

A compensation chamber is installed in the 
control line together with the listed regulators 
and actuators. The liquid filled in the cham

-

ber (water for steam control) acts as a buffer 
for process medium temperatures above 
150 °C and for steam. It prevents any hot 
process medium coming into direct contact 
with the actuator diaphragm and damaging 
it.

Installation

Install the compensation chamber at the 
highest point of the control line. Make sure 
that the control line between the diaphragm 
chamber and compensation chamber as well 
as between the pipeline and the compensa

-

tion chamber inclines downwards at a ratio 
of at least 1:10.
Connect the control line at the side of the 
pipeline transporting the process medium or 
the manifold.
The mounting position of the chamber is in

-

dicated on the chamber by an adhesive la

-

bel with an arrow as well as by the word 

oben (top)

 impressed on the chamber. It is 

imperative that the mounting position of the 
chamber is observed to guarantee the safe 
functioning of the regulator.
Weld the control line coming from the pres

-

sure tapping point to the R 

3

/

8

 socket of the 

chamber.

Reviews: