
5-6
EB 8084 EN
Installation
remove the studs inserted in the delivered
state. To proceed, lock the nut on the stud
with another nut. Use this nut to loosen
the stud. Unthread the stud.
Bolting the valve and silencer together
1. Lift the silencer using suitable lifting
equipment onto the valve (see informa-
tion under 'Lifting the silencer' in the
'Shipment and on-site transport' section).
Pay attention to the directions of flow for
the silencer and valve before lifting. Both
directional arrows must point in the same
direction.
2.
Use the correct flange gasket.
3. Use the supplied studs and nuts to bolt
the silencer and valve together.
The number of studs and nuts varies de-
pending on the number of holes in the
valve and silencer flanges.
Observe the usual tightening torque for
the corresponding bolt diameters. Apply
the full tightening torque gradually in a
crisscross pattern.
Fig. 5-7:
Valve and silencer not mounted
together, lifting eyelet on top
Fig. 5-8:
Valve, silencer, studs and nuts
Summary of Contents for 3381 Series
Page 12: ...2 2 EB 8084 EN ...
Page 21: ...EB 8084 EN 4 5 Shipment and on site transport Mid axis Fig 4 2 Type 3381 3 X with valve ...
Page 32: ...5 10 EB 8084 EN ...
Page 34: ...6 2 EB 8084 EN ...
Page 36: ...7 2 EB 8084 EN ...
Page 38: ...8 2 EB 8084 EN ...
Page 40: ...9 2 EB 8084 EN ...
Page 42: ...10 2 EB 8084 EN ...
Page 44: ...11 2 EB 8084 EN ...
Page 45: ......
Page 46: ......
Page 47: ......