background image

Assemble following the steps below

Step 7

Fit the tension bars to the back of the goal,

ALWAYS FIT IN THE TOP FIRST

.

Step 4

Assemble the tension bars with the part 
no’s shown, sliding and locking the 
parts together.

7

9

7

Step 8

Fit the net

, with colour cord to 

the top

.  Start by fitting the net to 

the top corners first, wrapping the 
net round the posts and fixing 
with the clips.

1

5

4

Step 3

Assemble the 2 uprights with the part 
no’s shown, sliding and locking the 
parts together.

1

5

4

S
A
M
B
A

S
A
M
B
A

Step 6

Fit the crossbar to the uprights.

Step 1

Assemble the base with the part no’s 
shown, sliding and locking the parts 
together.

3

3

3

5

5

10

10

2

10

Step 2

Assemble the crossbar with the part 
no’s shown, sliding and locking the 
parts together.

3

3

3

5

5

10

10

Before starting assembly lay all the components out on the ground and check they correspond with the parts list.

Step 9 

Securely anchor the goal to the ground using the anchors provided, use the arrows for guidance. On hard surfaces use 18Kg weights as shown. 

2

10

Step 5

Fit the uprights to the base.

S
A
M
B
A

S
A
M
B
A

S
A
M
B
A

S
A
M
B
A

Reviews: