Assemble following the steps below
Step 7
Fit the tension bars to the back of the goal,
ALWAYS FIT IN THE TOP FIRST
.
Step 4
Assemble the tension bars with the part
no’s shown, sliding and locking the
parts together.
7
9
7
Step 8
Fit the net
, with colour cord to
the top
. Start by fitting the net to
the top corners first, wrapping the
net round the posts and fixing
with the clips.
1
5
4
Step 3
Assemble the 2 uprights with the part
no’s shown, sliding and locking the
parts together.
1
5
4
S
A
M
B
A
S
A
M
B
A
Step 6
Fit the crossbar to the uprights.
Step 1
Assemble the base with the part no’s
shown, sliding and locking the parts
together.
3
3
3
5
5
10
10
2
10
Step 2
Assemble the crossbar with the part
no’s shown, sliding and locking the
parts together.
3
3
3
5
5
10
10
Before starting assembly lay all the components out on the ground and check they correspond with the parts list.
Step 9
Securely anchor the goal to the ground using the anchors provided, use the arrows for guidance. On hard surfaces use 18Kg weights as shown.
2
10
Step 5
Fit the uprights to the base.
S
A
M
B
A
S
A
M
B
A
S
A
M
B
A
S
A
M
B
A