5

Release system pressure then drain the pipe run where the device is to be 
located (it may be necessary to drain the whole system). When installing 
below a boiler or other object, allow 250mm clearance from the top of the 
canister to beneath the object, to enable the lid assembly to be removed 
when servicing. 

The device has been designed to facilitate various inlet and outlet 
configurations. Most configurations will require Elbows. For soldering we 
recommend 28x Yorkshire Solder Ring Elbow YP1222mm (code08290), or 
for compression we recommend 2 Yorkshire copper KS61522mm (code 
61124K) and the fitting instructions (which follow) are based around 
dimensions of these elbows. For clarity the recommended solder and 
compression fittings require the same dimension of cutout.

Vertical pipe run: Measure and mark a 110mm section for a 22mm unit, 
as shown below. Remove this marked section using a pipe cutter as 
shown. Now create 64mm and 106mm of 22mm copper pipe to attach 
between the respective elbow and compression fitting on the  inlet/
outlet. Tip: Reuse the cut out section.

Horizontal pipe runs: Measure and mark 73mm section and remove 
the marked section with a rotary tube cutter. Create 64mm and 134mm 
lengths of 22mm copper pip to attach between the respective elbow and 
compression fitting on the inlet/outlet. Tip: Reuse the cut out section.

Prepare the pipe and fittings, lubricate the olives and connect the 
valves on the pipe work, only hand tighten the connections at first.

1

Summary of Contents for MD22A

Page 1: ...DEFENDER Full Flow Magnetic Filter 5 Y E A R WARRA N T Y DEFENDER Full Flow Magnetic Filter 5 Y E A R WARRA N T Y Full Flow Magnetic Filter Models MD22A OPERATION MANUAL...

Page 2: ...can cause premature failure of valves and pumps and boiler efficiency is reduced dramatically as the particles contaminate the boilers heat exchanger and the complete system pipework The SALUS Mag Def...

Page 3: ...Vent Pipe RETURN Boiler INSTALLATION In order to achieve the best protection for the boiler it is recommended that the Mag Defender is fitted after the last radiator before the boiler How to service a...

Page 4: ...be fully evacuated of air during commissioning Pipe runs are vertical horizontal or any angle in between The inlet and outlet can also be swapped to suit Where the device is fitted to the metallic bu...

Page 5: ...w are based around dimensions of these elbows For clarity the recommended solder and compression fittings require the same dimension of cutout Vertical pipe run Measure and mark a 110mm section for a...

Page 6: ...supplied with this product Fit the drain valve assembly to the bottom of the Mag Defender making sure the outlet is at the front of the assembly and being careful not to overtighten as this may cause...

Page 7: ...h top air vent bleed the MD22A again after the system has reached temperature Take care as the water may be hot Always service see page 8 the filter before leaving the premises The Mag Defender spanne...

Page 8: ...any servicing work turn off electrical supply to the boiler and let the water cool down to a safe working temperature Using the Mag Defender spanner provided turn both isolation valves to the OFF posi...

Page 9: ...After approximately 30 seconds remove drain valve cap and use to open drain valve Have bucket or pipe connection ready to collect debris 3 Open inlet to flush out debris 4 Once all debris has been flu...

Page 10: ...L 10 Replace cap on drain valve and run the central heating system Bleed air through air vent if required 8 Close drain valve using drain cap ensure the cap is alligned correctly so the valve is fully...

Page 11: ...RUCTION MANUAL 11 After step 4 in servicing close inlet valve CHEMICAL DOSING 1 Replace cap on drain valve 3 Close drain valve using drain cap ensure the cap is alligned correctly so the valve is full...

Page 12: ...bottle of water treatment corrosion and scale inhibitor we suggest SALUS Inhibitor The canister will hold 500ml Using the MAG Defender spanner provided carefully unscrew the lid 4 Remove magnet cover...

Page 13: ...MD22A INSTRUCTION MANUAL 13 Re insert magnet cover 7 8 Now replace the lid onto the canister and tighten with the Mag Defender spanner Do not over tighten Re insert magnet 9...

Page 14: ...Bleed through top air vent bleed the MD22A again after the system has reached temperature Take care as the water will be hot Always service the filter before leaving the premises The Mag Defender span...

Page 15: ...t www hse gov uk electricity The inlet and outlet on the Mag Defender are reversible and there is no flow restriction Following installation don t forget to complete the warranty card Alternatively co...

Page 16: ...e Mag Defender is the flow and which is the return The inlet and outlet on Mag Defender are reversible and there is no flow restriction How often do I service the Mag Defender Servicing is required on...

Page 17: ...valves to the marked OFF position using the spanner provided Important Remember to switch off the electrical supply to the boiler when servicing the Mag Defender Will the Mag Defender affect my pacema...

Page 18: ...shall perform in accordance with its specification for a period of five years from the date of installation SALUS Controls sole liability for breach of this warranty will be at its option to repair o...

Page 19: ...Formoreproductsinthe SALUSrangevisit www salus tech com MD22A INSTRUCTION MANUAL 19 MD22A INSTRUCTION MANUAL 19...

Page 20: ...y hermetically sealedinSSTL304 500mlhydrolysisresistantcirculationchamber 22mmcompressionInlet andoutlet360swivel isolationvalve x2 BSPdrainvalve HydrolysisresistantNylonLid assemblywithEPDM O ring Sp...

Reviews: