Salus AKL06P Installation And Wiring Manual Download Page 2

AKL06P Zone Pump Wiring Center

 

Installation and Wiring Guide

Remove the plastic cover by unscrewing the 
4   screws.

Attach the back of the AKL06P to the wall or 
in a suitable location.

Warning

 

Use the powercord connections that are 

suitable for your system.

Clip all wires and cables into their 

 

correct positions.

Make the connections for the thermostats at the top 

of the AKL06P and for the pumps at the bottom of 

the wiring center. 
Cable clamps are required to be fitted to the case 

knock outs for ensuring that the cables are clamped.

Make sure that the fuses are each of 5 Amp, 

slow blow,  and in the correct position.

External timer

If you use non programmable thermostats and you 
have the clock terminals connected on your slave 
thermostats, the external timer can communicate 
via NSB signal. 

Note: You can set up your thermostats in Group 1, 
Group 2 or as Stand alone.

Re-attach the plastic cover and secure it with 
the 4 screws. Switch on the main power 
supply to the unit. The red LED comes on.

This equipment has been tested and found to comply with the limits for a Class B digital device, 
pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection 
against harmful interference in a residential installation. This equipment generates uses and can 
radiate radio frequency energy and, if not installed and used in accordance with the instructions, 
may cause harmful interference to radio communications. However, there is no guarantee that 
interference will not occur in a particular installation. If this equipment does cause harmful 
interference to radio or television reception, which can be determined by turning the equipment 
off and on, the user is encouraged to try to correct the interference by one or more of the following 
measures:
• Reorient or relocate the receiving antenna.
• Increase the separation between the equipment and receiver.
• Connect the equipment into an outlet on a circuit different from that to which the receiver is 
connected.
• Consult the dealer or an experienced radio/TV technician for help.
Changes or modifications not expressly approved by the party responsible for compliance could void 
the user’s authority to operate the equipment.
This device complies with part 15 of the FCC Rules. Operation is subject to the following two 
conditions: (1) This device may not cause harmful interference, and (2) this device must accept any 
interference received, including interference that may cause undesired operation.
This Class B digital apparatus complies with Canadian ICES-003.
Cet appareil numérique de la classe B est conforme à la norme NMB-003 du Canada.

LED indications

Name 

                           Colour        

Meaning

Power

  

 

AKL06P is supplied with 120VAC  power

Priority  

 

On when a Priority is active

Zone 1 

 

 

Demand from zone 1 thermostat: pump active

Zone 2  

 

 

Demand from zone 2 thermostat: pump active

Zone 3  

 

 

Demand from zone 3 thermostat: pump active

Zone 4  

 

 

Demand from zone 4 thermostat: pump active

Zone 5  

 

 

Demand from zone 5 thermostat: pump active

Zone 6  

 

 

Demand from zone 6 thermostat: pump active

Use the AKL06P wiring center to simply and safely connect thermostats and corresponding pumps. 
It can have two different physical configurations:
•  One thermostat for each  zone ( 6 thermostats in total ) 
• One group with one master SALUS thermostat and up to 5 slave thermostats. Link required on clock  

    

  terminals 1-2 and 3-6 (see       on the wiring diagram, front page)

Note:
1.  You can add one pump for each zone (6 in total), one primary pump and one priority pump.
2. You can use SALUS thermostats or any other thermostat that is compatible for your system.
3.  Make sure that the thermostats are all 24VAC.

Our recommendation is to use Salus thermostats. 
For more details please check our website www.salusna.com

Installing and Connecting the AKL06P

A

1. Primary Pump
The primary pump is controlling the heating system and will be switched on when any zone is on. 
Exception:  If the DIP Switch for Priority is ON, and the DIP Switch for Primary status during priority OFF , then 
the primary pump will be Off during a priority call. 

2. Priority Pump
The priority pump, if enabled, is for controlling the domestic hot water. This will enable the functions of Zone 
1 on a master unit only. When the Zone 1 thermostat calls for heat, the Priority pump will be ON and will run 
for up to 1 hour, switching OFF all other zones. After 1 hour, all the zones will resume to their normal function.
To enable the Priority pump there needs to be a Zone 1 thermostat connected to the domestic hot water 
control.

3. Zone Pumps
The Zone pumps will be activated when the thermostats are calling for heat, except when the priority zone is 
activated.

4. Auxiliar Outputs
There are 3 volt free auxiliar outputs. 
              AUX:   It will be active when any pump is ON and the Priority pump is OFF.
                XX:   It will be active when any zone is ON, including the Priority zone.
Zone 1 E/S :   It will be active when there is a priority call for DHW, this is used to 
override the boiler weather compensation.

5. Communication connections
The terminals (C1,C2,    ) can be used to connect up to 4 slave Pump Wiring Centers to your 
master Pump Wiring Center. The master wiring center needs to have the DIP switches set 
as Master and the slave pump wiring centers will have the DIP switches set as slaves. 

6. ZC / N Connector
When the Master switch is set to ON and the Priority Switch is set to OFF, the ZC/N connector 
on the AKL06P can be used to enable or disable the unit based upon the output from the 
boiler ZR/ZC 120V contact. When 120VAC is applied across ZC/N on the AKL06P, the unit will 
be enabled; when 120VAC is not applied across the ZC/N contacts of the AKL06P, the unit will 
be disabled and all pumps will be switched off.

Functioning Principles

DIP Switches function

DIP Switch

Description

Master/Slave

Choose the desired status for your Pump Wiring 

Center

Priority ON/OFF

When the Priority is ON, Zone 1 will operate as the 

Priority zone

Exercise ON/OFF

When the Exercise is ON, each zone that has been 

inactive for more than 72 hours will be switched 

on for 30 sec.

Primary status during Priority ON/OFF When ON, the Primary pump will be active during 

a Priority request.

Purge ON/OFF

When ON, Zone 1 will operate for 2 extra minutes 

after the Priority zone is switched off.

FCC Statement

                

Warning

 

Always make sure that the power to the wiring center 

is disconnected before opening the case.

Power 120V 

110mm/4.33in

110mm/4.33in

110mm/4.33in

Pump

Thermostat

1

2

3

6

5

4

7

Use the proper wire connectors (purchased 
separately) for a 120 VAC power suply system.

After placing the wires through the wire 
connectors, secure them by tightening the screws.