Salus AKL06P Installation And Wiring Manual Download Page 1

AKL06P Zone Pump Wiring Center

 

Installation and Wiring Guide

AUX

XX

ZONE1 E/S

TRANSFORMER

L

N

GROUND

L

N

PUMP2

L

N

PUMP3

L

N

PUMP4

L

N

PUMP5

L

N

PUMP6

L

N

PRIMARY

PUMP

L

N

120 VAC 
OUTPUT

24V - T-STAT 1

24V -T-STAT 2

24V -T-STAT 3

24V -T-STAT 4

24V -T-STAT 5

24V -T-STAT 6

MASTER

PRIORITY ON

EXERCISE ON

PRIMARY STATUS DURING PRIORITY ON

PURGE ON

SLAVE

OFF

OFF

OFF

OFF

POWER

PRIMARY
ZONE 1
ZONE 2

ZONE 3
ZONE 4

ZONE 5

ZONE 6

Group 1 thermostats

G1 (1-2)

Group 2 thermostats

G2 (3-6)

120   VAC

For PDF Installation guide go to www.salusna.com

These instructions apply to the SALUS model stated above.

                

Warning

This product must be 

 by a competent person, and installation must 

comply with the  guidance, standards and regulations applicable to the 

country or state where the product is installed. Failure to comply with the 

requirements of the relevant guidance, standards and regulations could 

lead to injury, death or prosecution. 

                

Warning

 

Always  isolate  the  AC  main  supply  before  installing  or  working  on  any 

components that require 120 V AC 60Hz supply.
 

The  ground  terminals  on  the  AKL06P  are  for  ground  connections  only. 

These terminals provide no earth protection.

120VAC TO  PUMP Cables will 
be supplied by the installer.

Maintaining a policy of continued product development SALUS Controls plc reserves the right to change 

Issue Date: Feb 2017   

www.salusna.com  Technical Helpline 1-650-360-1725

H

N

H

N

R

W

C

H

N

R

W

C

H

N

R

W

C

H

N

R

W

C

H

N

R

W

C

H

N

R

W

C

H

1-2

3-6

C1

C2

NSB 1-2/3-6

COMMS

A

R

G1

G2

H

N

H

N

H

N

H

N

H

N

BOILER

L                                  Line voltage 120VAC

 

Neutral  

 

 

Ground  

 

 

Night Set Back

                               Switch live output (0-24VAC)             
Fuse   

5 Amp Slow blow

AUX 

 

Auxiliar, Dry contact

XX 

 

Dry contact  

Zone1 E/S 

Dry contact 

C1 

           Communication Connections

C2                        Communication Connections

Electrical connections

FUSE  5A 

SLO

W  B
LOW

FUSE  5A 

SLO

W  B
LOW

FUSE  5A 

SLO

W  B
LOW

FUSE  5A 

SLO

W  B
LOW

FUSE  5A 

SLO

W  B
LOW

FUSE  5A 

SLO

W  B
LOW

FUSE  5A 

SLO

W  B
LOW

POWER IN

GROUND

PRIORITY

PUMP1

H/R                             Hot 24VAC
   /W                   Switch live output (0-24VAC)
N/C 

 

Return  24VAC

 

 

Night Set Back 

Electrical  connections  for 

24VAC thermostats

ZC/ZR

Zone1 E/S (ZC/ZR)

PRIORITY

ZC

N

Reviews: