Salsbury Industries S-54000 Series Installation Instructions Download Page 4

15"

 Wide See-Through Lockers – S-54000 Series 

Four Tier Installation Instructions 

Sloping Hood Installation (Optional) 

Step 1:

 Assemble the top panel to the rear panel with #10 - 24 x 3/8” slot less screws 

and #10 nuts (provided).  Position the flange of the top panel behind the rear panel. 

Step 2:

 Assemble the side panels to the top panel and rear panel with #10 - 24 x 3/8” 

long slot less screws and #10 nuts (provided). 

Step 3: 

Attach the sloping hood to the top of the locker with #10 - 24 x 3/8” slot less 

screws and #10 nuts (provided). 

Summary of Contents for S-54000 Series

Page 1: ...n its back with the shelves pointing upward Attach the first side panel the left rear leg and three compartment dividers to the assembly from Step 1 Step 3 Attach the second side panel and the right rear leg to the assembly of Step 2 The locker chassis is now complete Step 4 Attach the pre assembled door frame onto the assembly of Step 3 Step 5 Tighten all fasteners checking for squareness of the ...

Page 2: ...Step 1 Step 3 Attach the second top shelf and the second bottom shelf to the second back panel as in Step 1 Step 4 Simultaneously attach the assembly of Step 3 second Step 1 assembly the second side panel and three additional compartment dividers to the assembly of Step 2 Step 5 Attach the third top shelf and the third bottom shelf to the third back panel as in Steps 1 and 3 Step 6 Simultaneously ...

Page 3: ...of Step 7 then fasten one by one Step 9 Tighten all fasteners checking for squareness of the locker while tightening Attach optional sloping hoods end bases or front bases see pages 4 and 5 Step 10 Place the locker in the installed location and anchor to the floor wall or to both Individual job conditions will dictate the type of fastening anchors to use not provided Step 11 Fasten all lockers in ...

Page 4: ...r panel with 10 24 x 3 8 slot less screws and 10 nuts provided Position the flange of the top panel behind the rear panel Step 2 Assemble the side panels to the top panel and rear panel with 10 24 x 3 8 long slot less screws and 10 nuts provided Step 3 Attach the sloping hood to the top of the locker with 10 24 x 3 8 slot less screws and 10 nuts provided ...

Page 5: ...er with the flange upward Assemble to the locker with 10 24 x 3 8 slot less screws and 10 nuts provided End Base Installation Optional Position the appropriate end base right or left behind the corresponding side legs right or left of the locker with the flange upward Assemble to the locker with 10 24 x 3 8 slot less screws and 10 nuts provided Repeat for the other side ...

Reviews: