background image

12" Wide 

Vented

 

Lockers 

 

7

1000 Series

 

Single Tier Installation Instructions 

  

Phone: 1-800-562-5377 

         Int’l Phone:  323-846-6700 

  Fax: 1-800-562-5399      

     Int’l Fax:  323-846-6800 

  www.lockers.com   

     [email protected] 

Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability. 

Copyright © 

2020

 Salsbury Industries.  All rights reserved.   Page 3 of 5  (Rev. 02 - 12/04/17) 

SALSBURY INDUST

 

 

R

 

IES 

18300 Central Avenue, Carson, CA 90746-4008

Three Wide Locker Assembly (continued) 

Step 7:

  Attach the last side panel and the right rear leg to the assembly of Step 6.  On

12”  and  15”  deep  lockers  attach  the  last  single  coat  hook.    On  18”  deep  lockers 
substitute the last single coat hook with a double bend instead of the last single coat 
hook and install the last coat rod.  The locker chassis is now complete. 

Step 8: 

 Position the pre-assembled door frames onto the assembly of Step 7 then

fasten one by one. 

Step 9:

  Tighten all fasteners checking for squareness of the locker while tightening.

Attach optional sloping hoods, end bases or front bases (see pages 4 and 5). 

Step 10:

  Place the locker in the installed location and anchor to the floor, wall, or to

both.    Individual  job  conditions  will  dictate  the  type  of  fastening  anchors  to  use  (not 
provided).  

Step 11:

  Fasten all lockers in a row together by installing fasteners (provided) through

the side panels.  Installation is now complete. 

Coat Rod Installation – 18” Deep Single Tier Locker Only 

Reviews: