KF T120/KF T120 EC
EN MOUNTING AND INSTALLATION INSTRUCTION
Page 1: ...KF T120 KF T120 EC EN MOUNTING AND INSTALLATION INSTRUCTION...
Page 2: ...ly by trained and qualified staff familiar with this type of equipment installation verification mainte nance and required tools for installation works Make sure that all the warning signs on the fan...
Page 3: ...548 407 250 196 500 29 225 4L3 161 131 537 305 253 250 250 80 50 597 456 277 222 500 34 250 4L3 170 146 577 342 278 315 315 90 50 651 500 290 236 620 44 280 4L3 180 153 626 367 304 315 315 90 50 688 5...
Page 4: ...26 b SP27 b KF T120 160 4 L3 180 4 L3 200 4L3 225 4L3 phase voltage 50 Hz VAC 3 400 50 3 400 50 3 400 50 3 400 50 power kW 0 18 0 29 0 54 0 92 current A 0 57 1 0 1 44 1 72 speed min 1 1310 1340 1390 1...
Page 5: ...er flange 2 Hinges 3 Housing 4 Anti vibration feet 5 Connection Ring 6 Fan 7 Fat chutes with a plug 1 2 8 Switch 9 Roof 10 Engine 11 Electrical connection box 12 Feet 13 Panel bushings 14 Handle Avail...
Page 6: ...STORAGE All units are packed in the factory to withstand regular conditions of transportation Upon unpacking check the unit for any damages caused during transportation It is forbidden to install dam...
Page 7: ...T120 EC Control Accessories 1 MTP010 regulator 2 Stouch panel 3 Stouch S 1141 Domestic use installed filters box For industrial use filters installed extractors Exhaust air Kitchen hood AB AGO ALU Mo...
Page 8: ...tor cools down and connected capacitors when used discharge Ensure that the fan and installed parts and accessories are firmly and tightly installed Carefully clean the impeller to avoid changing the...
Page 9: ...rical connection box The fan has to be connected according to the electric scheme which is described in this document and is shown under the electricity connection switch cap Before turning on it is n...
Page 10: ...L3 2 1 1 2 1 2 2 1 3 2 1 4 2 1 5 2 W1 gr ye W1 black W1 brown W1 grey W3 1 W3 2 W2 1 W2 2 W2 3 PE 1 L1 2 L2 3 L3 3 NC 2 COM 4 Ain1U 0 10V 3 GND 5 10V M1 SP27 b Black 0 5 Black 0 5 Black 0 5 Black 0 5...
Page 11: ...6 PE 1 PE 2 1 2 3 4 5 6 F2 L3 1 2 3 4 5 6 K2 L3 L1 L2 1 2 3 4 5 6 F2 K K2 1 2 3 4 5 6 Q2 1 2 3 4 5 6 PE PE 1 L2 2 L2 1 PE 2 PE SP27 b 1 L1 2 L1 N N With speed controller SMT D 4P EL which allows to se...
Page 12: ...4 PE L1 N K1 A1 A2 K1 1 2 3 4 F1 1 2 10V 1 5 2 1 L1 2 1 1 2 1 2 2 1 3 2 1 4 2 1 PE 2 1 N 2 PE N L1 GND NC COM SP26 b SP25 b 0 10V PE Q1 1 2 3 4 5 6 Vout GND SMT D 4P EL Vin max 1 1mA GND 1 2 3 4 N L1...
Page 13: ...e the launching Make sure that all the bolts and nuts are tightened before the launching MAINTENANCE SAFETY REQUIREMENTS Installation works can only be performed by trained and qualified personnel The...
Page 14: ...balance ant the specialized company Adhesions on the impeller Clean carefully rebalance if necessary Material decomposition on the impeller due to aggressive material conveyed Contact the manufacturer...
Page 15: ...e electrical connection according presented connection scheme Temperature indicator has responded Allow the motor to cool down find and elim inate the cause release reactivation lock if applicable Ele...
Page 16: ...ment and risk reduction LST EN 60204 1 Safety of machinery Electrical equipment of machines Part 1 General requirements LST EN 60335 1 Household and similar electrical appliances Safety Part 1 General...
Page 17: ...the equipment to manufacturer Delivery costs should be covered by customer Manufacturer reserves the right to change this technical passport any time without prior notice if some typographic errors o...
Page 18: ...18 KF T120_KF T120 EC v2019 04...
Page 19: ...19 KF T120_KF T120 EC v2019 04...
Page 20: ...000211 UNIT S MAINTENANCE TABLE Product name lot number Instalation Interval Date Fan cleaning Once a year Heat exchanger cleaning Once a year Filter replacement Every 3 4 months Look at the product l...