Sakura HBK-18?23AB Operation / Installation / Service Manual Download Page 14

2
Make  sure  to  read  th

. Important Notice for Installation 

e  use  instructions  and  carry  out  the  work  by  strictly  complying  with  the 

sed space, the air outlet should be installed, so as to keep the balance of air outlet 

2

B

stalled  horizontally,  and  the  space  between  machine  and  wall 

3

23DS/B,23BS/B and 23AS/B,it is better to install air pipe. 

ameter  should  be 

4

ir volume, so as to make the air volume of the branch pipe reach the 

5

I

6

L

ent is required for the air pipe. As for the down discharge model, four 

 air 

7

W

nce ladder shall be installed near the unit (the ideal material is stainless steel), 

8

W
s

an  burglar  mesh  is  installed  on  the  windowl,  try  to 

9

rity out 

project plan. 

1

The equipment is suitable to use in an open space. If it is required to install the equipment 

in a clo
volume and air inlet. 

efore installing the bracket of the air conditioner, the level line shall be fixed with level bar. 

The  bracket  shall  be  in
should be between 280 to 330mm. (It varies from different locations).The indoor controller 
shall  be  at  least  1.5m  above  the  floor,  and  the  soldering  and  installation  of  mounting 
bracket  shall  be  stable.  It  shall  be  installed  horizontally.  The  unit  shall  be  installed 
outdoors, and the dynamic load of the mounting bracket shall be more than 250kg. If the 
bracket is installed 3 meters above the ground, it shall be added with guard rail. The water 
supply pipe and drainage pipe shall be properly installed. The water supply pipe shall be 
installed with pipe filer, so as to keep the incoming water clean. The drainage pipe shall 
be  kept  unblocked,  which  shall  adopt  PVC  pipe  and  be  connected  and  installed  with 
speed glue. 
It is not recommended to install air pipe for model no., 18DS/B,18BS/B and 18AS/B;While 
for model no.
When installing air pipe,the length should be within 30 meters,and the diameter of pipe 
should  be  changed  by  every  10  meters.For  the  first  10  meters,the  di
800*500 MM,for the second should be 700*500 MM,for the third should be 600*500MM. 
The area of airflow outlet shall not be less than 1m

2

, or the length and size of the air pipe 

shall  be  made  according  to  the  design  standard.  After  the  air  pipe  enters  the  wall,  the
airflow  outlet  shall  be  not  less  than  2.2  meters  above  the  ground  (excluding  special 
circumstances). 
If there is branch air pipe, the air deflector must be installed on the branch pipe to regulate 

or balance the a
design value.   

f need low noise, the silencing elbows shall be used, so as to meet the requirement. 

eak-proof treatm

10mm drainage vents shall be left on the bottom of the waterproof elbow. When the

pipe  is  connected  to  the  room  through  the  top  of  the  building,  leak-proof  treatment  is 
required for the top building, so as to avoid the rainwater running into the room along the 
air pipe. 

hen  the  outdoor  unit  is  installed  on  the  wall  without  window  or  far  from  window,  an 

maintena
so as to facilitate the maintenance. 

hen the outdoor unit is installed under the window, the glass window shall be movable, 

o  as  to  open  it  when  necessary.  If 

install a movable door with lock on the burglar mesh in case of any maintenance. 
Before testing the machine, check whether the water level is between the normal range. If 
the water level is too high or low, please adjust the float ball. Pull the dust and impu
of  the  water  pipe,  check  the  power  supply  and  if  there  is  any  leakage  on  the  water 
inlet/outlet pipe, then the testing can be started.

12

SAKURA – Total Air Conditioning Solution 

Summary of Contents for HBK-18?23AB

Page 1: ...ditioner User friendly Earth friendly Evaporative Air Cooler Operation Installation Service Manual HBK 18 23DS B Ref S 116 03 10 HBK 18 23AS B HBK 18 23BS B LCD wall pad remote controller Hand held remote controller ...

Page 2: ... 3 6 UNIT PARTS IDENTIFICATIONS 4 7 PACKING LIST 4 8 SAFETY CAUTION 4 9 CIRCUIT DIAGRAM 6 10 MAIN CONTROL BOARD 7 11 OPERATING INSTRUCTIONS 7 12 INSTALLATION INSTRUCTIONS 8 13 CLEANING AND MAINTENANCE 13 14 TROUBLE SHOOTING 14 SAKURA Total Air Conditioning Solution Please read this instruction carefully before using PAGE ...

Page 3: ...r conditioner has following advantages Power saving it can save over 80 compared with traditional air conditioner Environment friendly No harmful material no freon during operating High Efficiency Use the min power to make the max cooling and purifing effect Working Principle The evaporative air cooler produces effective cooling by combining a natural process water evaporation with a simple reliab...

Page 4: ...m h 18000m h 23000m h Voltage Frequency 380V 50Hz Current 2 2A 2 8A 2 2A 2 8A 2 2A 2 8A Power 1 1KW Motor High efficient and waterproof type Fan Type axial Water Tank Vloume 25L Dimension mm 1100 1100 950 1100 1125 950 1100 1100 1040 Net Weight 69kg 71kg 78kg Applicable Area 80 100 m Air Outlet Size 670 670 mm Noise 60dB 70dB 60dB 70dB 60dB 70dB Water Consumption 5 20 L H 2 SAKURA Total Air Condit...

Page 5: ...internetbar shopping mall supermarkets etc 4 Some public places like kitchen vegetable market clubs parking lot bus station etc 5 Greenhouses flowers and fowl farm etc 6 The room which has requirements of high humidifing 1 Ambient temp 2 45 2 Ambient humidity 90 3 Atmospheric pressure 86KPa 106Kpa 4 Water should be processed with softening water temp 0 45 water pressure 0 15 0 6Mpa 5 Input voltage...

Page 6: ...the user or other people or property damage the following instructions must be followed This symbol indicates CAUTION This symbol indicates NEVER DO THIS This symbol indicates ALWAYS DO THIS 4 SAKURA Total Air Conditioning Solution 6 STRUCTURE CHART 7 PACKING LIST 8 SAFETY CAUTIONS ...

Page 7: ...5 SAKURA Total Air Conditioning Solution ...

Page 8: ...rials Keep the unit working in a flat place Make the air outlet inlet not close to wall curtain etc it may affect the performance Only authorised service technician are allowed for repair or maintenance 6 SAKURA Total Air Conditioning Solution 9 CIRCUIT DIAGRAM ...

Page 9: ...lack of phase please cut off immediately and ask professional technician for maintenance 6 After power on press to run in clean mode Drainage pump start and run for 2 minutes 7 Under the condition of ventilation or cooling if need swing function press Press to stop swinging This function could only be used in the existence of electric stop operating press o binet to affect the operation lck the ai...

Page 10: ... Installation Methods 1 Installation Drawing for Down Discharge Unit 8 SAKURA Total Air Conditioning Solution 12 INSTALLATION ...

Page 11: ...Installation Drawing for Side Discharge Unit 9 SAKUR Total Air Conditioning Solution A ...

Page 12: ...Installation Drawing for Up Discharge Unit 10 SAKURA Total Air Conditioning Solution ...

Page 13: ...Mounting Bracket Planform Mounting Bracket Side View 11 SAKUR Total Air Conditioning Solution A ...

Page 14: ...installed with speed glue It is not recommended to install air pipe for model no 18DS B 18BS B and 18AS B While for model no When installing air pipe the length should be within 30 meters and the diameter of pipe should be changed by every 10 meters For the first 10 meters the di 800 500 MM for the second should be 700 500 MM for the third should be 600 500MM The area of airflow outlet shall not b...

Page 15: ...r off after 2 minutes nnect power unscrew the screws on the shutterand take off the shutter Cle t which easy to create bubble and 13 Clean wate Method 1 Press drain b 2 Disco 3 Clean the bottom with soft brush 4 Clean the dirt from the water level sensor 5 Clean the water pump drainage pump and filter with brush an he cabinet Clean the cabinet with soft detergent Do not use the detergent hard brus...

Page 16: ...fan blade Noise ut of shape h 1 Fan blade demaged or o 2 Replace motor 2 Motor abrasire 3 Clean the bolcks 3 T ere sundries block the airout d or too low wind ng pad or filter pads and filter oard amaged or not 1 Clean or replace 1 Blocking on cooli 2 Replace main control b 2 Main control board damage 3 Check if motor d 3 Motor no working No win 4 Check the phase 4 Lack of phase on motor 1 Add wat...