Indoor and Outdoor Unit Connection
Ensure cleanliness of the connecting copper pipes for split type mini chiller is maintained all the
WLPH6HDOERWKWKHRSHQHQGVRIFRSSHUSLSHVEHIRUHEUD]LQJRUFRQQHFWLQJXVLQJÀDUH0DNH
sure that there is no dented pipe and always make use copper bending tools to bend copper
pipes.
Vacuuming and Refrigerant Charging
The packaged or outdoor unit for mini chiller is fully charged with refrigerant in the factory. For
split type mini chiller, after the copper pipes are connected and before opening the valves, the
indoor pipes need to be vacuumed. It is important that indoor unit is properly vacuumed to make
sure the system is free of dust and moisture.
Note: Vacuum level must be maintained at 130Pa for at least 5 minutes to check for leakage.
Water Piping
a)
Air vent must be installed at the highest position. Open the air vent to release the air
trapped in the water system.
b)
It is recommended to install water tank to lower the frequency of compressor loading
and unloading during low load condition. Ensure the water volume in the system does
not less than 10L/kW (water volume/load).
c)
Install an expansion tank at the highest position as shown in the diagram.
d)
Install a relief valve allow mini chiller release excessive pressure when water pressure
exceed 5 Bar.
H
(QVXUHWKHÀRZVZLWFKLVLQVWDOOHGDQGIXQFWLRQSURSHUO\
f)
Ensure all water pipes are well insulated.
g)
Fill up water after water piping work complete. Check the water leakage at connections
and joints.
FVCA
Summary of Contents for FVCA-100 B
Page 27: ...Page 2 Dimensions Dimension in mm Model FVCA 50C R 60B R Model FVCA 40B Dimension in mm ...
Page 29: ...Page 2 Wiring Diagram Wiring Diagrams Model FVCA 40B ...
Page 30: ...Page 2 Wiring Diagram Model FVCA 50C Model FVCA 50CR ...
Page 31: ...Page Model FVCA 60B Model FVCA 60BR ...
Page 32: ...Page Model FVCA 80 C Model FVCA 80 CR ...
Page 33: ...Page 3 Model FVCA 80 100 120 B Model FVCA 80 100 120 BR ...
Page 34: ...Page 3 Model FVCA 150 200 B Model FVCA 150 200 BR ...