HS2/AS2 Series
67
68
The steps of running Self-test are as followed:
Step 1: Connect a communication module (Wi-Fi/ 4G/Ethernet) with inverter (connection procedure can refer to eSolar
Module Quick Installation Manual)
Step 2: Select Italy for Country and choose your corresponding Grid Code from Initial Setting.
Step 3: You can choose self-test item required. Individual self-test time is approx. 5 minutes. All self-test time is approx. 40
minutes. After the self-test is completed, you can save the test report. If self-test is failed, please contact with SAJ or your
inverter supplier.
6.8 Setting Reactive Power Control
(For Australia)
6.8.1 Setup Fixed Power Factor Mode & Fixed Reactive Power Mode
Fixed Power Factor Mode