SAJ H2-5K-T2 Quick Installation Manual Download Page 2

 

V1.1

 

© 2023 Sanjing. All rights reserved.

 

 

 

 

ATTENTION:

 For the 

EMS/METER port, only use 
pin 1 

RS485-A1+

 

and pin 2 

RS485-B-

 of the meter cable 

for connection.

 

 

Step

 

Illustration

 

Communication cables:

 

1.

 

Loosen the waterproof cover from the inverter. 
Loosen the nut from the cable gland on the 
waterproof cover.

 

2.

 

Insert the communication cables through the nut and 
then the cable gland. Insert the cables into the 
corresponding communication ports.

 

3.

 

Tighten screws to secure the waterproof cover to the 
inverter. 

 

4.

 

Tighten the nut back to the cable gland.

 

Communication module:

 

1.

 

Open the cover on the 4G/WIFI port.

 

2.

 

Insert the communication module to the 4G/WIFI 
port and secure the module by rotating the nut.

 

M4*10

0.6-0.8 N·m

 

8.

 

Connecting the battery to the inverter

 

Select cables according to the below specification.

 

Conductor cross-sectional area of cables 
(mm²)

 

Range

 

Recommended value

 

4.0 – 6.0 

 

5.0

 

 

Step

 

Illustration

 

1.

 

Get the waterproof cover from the accessory 
bag and cut holes in the rubber plug. Insert the 
cables through the hole.

 

2.

 

Strip the insulation (8 – 10 mm length) on the 
positive and negative cable ends.

 

  – 1  

mm

 

3.

 

Assembly the positive and negative cables with 
the crimping pliers.

 

 

4.

 

Insert the positive and negative cables into the 
blue positive and negative battery connectors. 
Gently pull the cables backwards to ensure firm 
connection.

 

 

5.

 

Tighten the lock screws on the positive and 
negative connectors.

 

 

6.

 

Connect the BMS to the BAT+ and BAT- ports on 
the inverter. 

 

 

9.

 

Assembling the PV-side electrical connection

 

Select cables according to the below specification. For details, refer to the inverter user manual.

 

Specification

 

Range

 

Recommended value

 

Conductor cross-sectional area of cables (mm²)

 

4.0 – 6.0 

 

4.0

 

External diameter (mm)

 

4.2 – 5.3

 

5.3

 

 

Step

 

Illustration

 

1.

 

Prepare cables by referring to similar operations in steps 1 -4 in section 8 for preparing the battery cables.

 

2.

 

Ensure that the DC switch is in OFF 
position. For further safety consideration, 
use a reliable tool (such as a lock with a 
key) to lock the switch, so that others 
cannot unlock it easily.

 

 

3.

 

Connect the positive and negative 
connectors into the positive and negative 
DC input terminals of the inverter. 

 

After you hear a “click” sound, the contact 
cable assembly is seated correctly.

 

 

4.

 

Install the waterproof cover for PV and 
battery ports.

 

M4*10

0.6-0.8 N·m

 

10.

 

Performing subsequent operations

 

1.

 

(Optional) To set the export limitation function, connect and set the smart meter. For details, refer to the user manual.

 

2.

 

Unlock and turn on the DC switch on the inverter. 

 

3.

 

Turn on the battery switch.

 

4.

 

Turn on the breaker on the grid side. 

 

5.

 

Perform configuration commissioning on the eSAJ Home App. For details, refer to the 

Configuration Instructions

.

 

Installer:                                                           

 

1

NC

1

DRM 1/5

1

NC

2

NC

2

DRM 2/6

2

NC

3

NC

3

DRM 3/7

3

NC

4

CANH

4

DRM 4/8

4

NC

5

CANL

5

RefGen

5

NC

6

NC

6 Com/DRM 0

6

NC

7

NC

7

NC

7 RS485-A2+

8

NC

8

NC

8 RS485-B2-

1 RS485-A1+

1

NC

1

NC

2 RS485-B1-

2

NC

2

NC

3

NC

3

NC

3

NC

4

NC

4

NC

4

NC

5

NC

5

NC

5

NC

6

NC

6

NC

6

NC

7

NC

7

NC

7

NC

8

NC

8

NC

8

NC

RS485

PORT0

PORT1

EMS/METER

DRMs

BMS/CAN

PV+

PV-

PV+

-

+

PV-

-

+

Reviews: