- 25 -
3.
【
SET-UP Position & maintenance
】
Attention:
◎
The power must be turned off before any movements.
◎
Check the power rate before use AC110V~120V/AC220V~240V ,
d
epending on Outlet Label.
V.Adjustment and Inspection
You can find the audit system by opening the main part door.
IC board includes POWER
、
FUSE
、
AUDIT and TEST functions
Please see
【
1 Link adjustment
】
for IC board function.
Fix position after assembly
1.Hoist the machine from the hoist
point.
2.Keep at least 50cm(20”) space
from the back for maintenance
and to avoid over heating.
Electrical plug display
50CM(20’’)
Summary of Contents for Street Basketball Deluxe LED
Page 37: ...37...