background image

13

Step 5

Bakelite-D Installation

Prepare
materials

NO.

1

2

3

NAME

Phenolic Resin Plate 

Bolt M5*16

Nut 20M5

SIZE

Bakelite-D

M5*16

20*M5

QTY.

1

10

6

Summary of Contents for GENMITSU 3018-PRO

Page 1: ...USER MANUAL GENMITSU CNC ROUTER 3018 PRO...

Page 2: ...Contents Part 1 Package List 2 Part 2 Mechanical Installation 6 Part 3 Debugging 19 Part 4 Offline Controller 25 1...

Page 3: ...Part 1 Package List 2 Name Size Picture Qty Aluminum Profile Guide Rail X Axis Guide Rail Y Axis Lead Screw 20 40 290mm 20 20 360mm 300 180mm 10 360mm 10 290mm T8 365mm T8 295mm 2 2 1 2 2 1 1...

Page 4: ...3 Name Size Picture Qty Phenolic Resin Plate Stepmotor Spindle ER11 X Z Axis Assembly Slider Nut Seat Milling Cutter 4 2 1 1 4 1 10...

Page 5: ...4 Name Size Picture Qty 4P Motor Line Offline Controller Spindle Motor Line 24V Power Supply Control Board Fan Case USB Cable Plate Clamp 3 1 1 1 1 1 4...

Page 6: ...ame Size Picture Qty Winding Tube USB Stick Allen Wrench Bolt Copper Nut Nut 20M5 Spring Coupling Set Screw M5 16 M3 14 2M 1 4 43 4 8 2 16 10 2 2 20 M5 30 M5 M5 10 Nut 30M5 1 5mm 2 0mm 2 5mm 3 0mm 4 0...

Page 7: ...Part 2 Mechanical Installation 6 Bakelite...

Page 8: ...tallation Bolt Prepare materials NO 1 2 3 4 5 6 NAME Aluminum Profile Phenolic Resin Plate Phenolic Resin Plate Bolt M5 16 Slider Guide Rail Y Axis SIZE 2040 290mm Bakelite A Bakelite B M5 16 10 290mm...

Page 9: ...M5 16 x10Pcs Prepare materials NO 1 2 3 4 5 6 7 8 9 10 NAME Aluminum Profile Copper Nut Spring Nut Seat Bolt Bolt Nut 30M5 Lead Screw Stepmotor Coupling Set Screw SIZE 300 180mm M5 16 M3 14 30 M5 T8 2...

Page 10: ...9 Completed...

Page 11: ...10 Step 3 Base Bakelite C Installation Prepare materials NO 1 2 3 NAME Phenolic Resin Plate Bolt Nut 20M5 SIZE Bakelite C M5 16 20 M5 QTY 1 6 6...

Page 12: ...11 Completed...

Page 13: ...per Nut X Z Axis Assembly Prepare materials NO 1 2 3 4 5 6 7 8 9 NAME X Z Axis Assembly Copper Nut Spring Aluminum Profile Guide Rail X Axis Lead Screw Coupling Set Screw Bolt Bolt SIZE 20 20 360mm 10...

Page 14: ...13 Step 5 Bakelite D Installation Prepare materials NO 1 2 3 NAME Phenolic Resin Plate Bolt M5 16 Nut 20M5 SIZE Bakelite D M5 16 20 M5 QTY 1 10 6...

Page 15: ...14 Completed...

Page 16: ...15 Step 6 Spindle Installation...

Page 17: ...16 Caution Tighten the bolt without using excessive force to prevent plastic damage...

Page 18: ...17 Step 7 Control Board Installation Control board Bolt M5 10 x4pcs Nut 20 M5 x4pcs...

Page 19: ...Spindle 17 USB Connect your CNC to computer using the bundled USB cable Stepmotor Connect the red wire to the port next to the red mark X Y Z Laser 12V 5Amax Not include 24V DC Power adapter Offline...

Page 20: ...19 Part 3 Debugging 1 Install the driver software Driver CH340SER exe...

Page 21: ...Start Right click Computer Select Manage Select Device Manager from left pane In the tree expand Ports COM LPT Your machine will be the USB Serial Port COMX where the X represents the COM number for e...

Page 22: ...21 3 Open Grblcontrol software software Grblcontrol GrblControl exe choose the correct port...

Page 23: ...sole window print CTRL X Grbl 1 1f for help If the connection is successful Console window print Serial port error 1 No such file or directory indicate that the connection is failed successful unsucce...

Page 24: ...ontrol Use spindle on off The X Y Z axis jog The spindle speed 0 100 It does not represent the actual speed and it represents the ratio And this percentage is not linear 100 100 1000 10 1000 1000 1000...

Page 25: ...24 Tool setting spindle should be on when moving the bits zero XY zero Z Use the jog to move the milling cutter Then click button zeroXY and zeroZ Open the G code file Start working End...

Page 26: ...art 4 Offline Controller 25 Notice When using the offline controller remove the USB cable from the PC Offline controller and PC cannot be used together 1 Connect offline controller to PC via USB cable...

Page 27: ...26 2 Then copy the NC file to the offline controller...

Page 28: ...27 3 Offline controller connected to the control board 4 Press the X X Y Y Z Z key to move the spindle to the machine origin select the engraving file click the OK key to start engraving...

Page 29: ...28 5 Interface introduction A Menu Page Ctrl Machine Control File Use the G code file Press key Y or Y to select Press key OK to Enter...

Page 30: ...axis negative direction Y axis positive direction Y axis negative direction Z axis positive direction Z axis negative direction Spindle On Off Long press to exit short press to change step 0 1 1 5 10m...

Page 31: ...30 C File Page Press key Y or Y to select file Press key OK to Enter Press key OK to begin if you are ready...

Page 32: ...www sainsmart com 2711 Centerville Road Wilmington DE 19808 United States support sainsmart com...

Reviews: