27
NAME
QTY.
Step 18: Install Control board Assembly
NO.
Operation
Steps
Prepare
materials
BEFORE
AFTER
CODE
Tools
Check
Remind
Control board MC3D3
Insulated Board
M5 Bolt M5 x 14mm
Nut20 x M5
ABS spacer
MX3-22
MX3-23
MX3-54
MX3-60
MX3-62
1
1
4
4
4
Allen wrench (4mm)
1
2
3
4
5
1
1
Fix the distance between the Control board and Phenolic
resin plate-R for 30mm
。
30mm
MX3-22
MX3-60
x 4Pcs
MX3-23
MX3-62
x 4Pcs
MX3-54 x 4Pcs