background image

HOT WATER BOILERS: 

Probe must be installed at or

above the minimum safe water level established by the
boiler manufacturer. The probe may be installed directly
in the boiler (A) if a suitable tapping is available, in the
riser (B), in the header horizontally  (C), or in the header
vertically (D). 

IMPORTANT: 

To assure proper drainage,

pipe diameter should be no less than 1" on installations
in vertical piping and no less than 1

1

4

" on installations in

horizontal piping.

WARNING: 

To prevent electrical shock or equipment damage, power must be off during installation or servicing of the control. To prevent

serious burns, the boiler should be thoroughly cooled before installing or servicing control. Only qualified personnel may install or service
the control in accordance with local codes and ordinances. Read instructions completely before proceeding.

Loosen the two control box cover bind-
ing head screws and remove the cover.

Slide keyhole slots over probe mounting
screws and tighten screws (with either a
1/4" hex head driver or flat screwdriver.

Connect the ring terminal wire lead to the probe terminal
stud and secure with the lock washer and wing nut provided.

With the power removed,

proceed with installation and

wiring according to Method A or B described on next page.

STEAM BOILERS (Secondary) : 

Control must be installed in a suitable tapping provided in

the boiler(A), or in an equalizing line(B). The control should be located below the level of the
primary low water cut-off but above the lowest permissable water line as specified by the
boiler manufacturer. 

Note: 

For installations in equalizing lines, Hydrolevel recommends the use of Safgard Tees

(see step 2).

Low Water Cut-Offs

550 / 650 / 750 Series

120 VAC Operating Voltage

Automatically shuts off burner in a low water condition to prevent
boiler damage.

Low maintenance. No moving parts to wear stick or hang up, as in
float devices.

Test button (550 & 650 Series) allows the burner circuit and 
control to be tested without lowering the water level.

Manual reset feature (550 & 750 Series) will not lock out in power
failures.

1. Where To Install

4. Control Mounting

MINIMUM

WATER LEVEL

HOT WATER
BOILER

A

B

C

D

SECONDARY

LWCO

SECONDARY
LWCO

LOW WATER
CUT-OFF PUMP
CONTROLLER

LOW WATER
CUT-OFF PUMP
CONTROLLER

TYPICAL STEAM BOILER
INSTALLATIONS

HOT WATER BOILER
INSTALLATIONS

A

B

TEE MOUNTING: 

If a field fabricated tee is used, make sure that the tee drains thor-

oughly when the water level falls below it, and that it conforms to the spacing require-
ments described in Step 3. Models equipped with the shorter EL1214-SV probe can be
installed in most standard reducing tees. Safgard cast iron tees are also available to
accommodate all probe models (See page 4). 

2. Tee Options

3. Probe Installation

STANDARD 

REDUCING TEE

(SV  Models Only)

FOEM-TEE

(160psi)

1214C-2 TEE

(250psi)

FABRICATED TEE

Apply pipe sealing compound to
threads before installing probe.
Teflon tape is not recommended.
Check to insure 1/4" clearance from
probe to any surface or tee.  

CAUTION:

The probe tip

must extend fully into the
boiler or pipe run. If the
probe is recessed, sedi-
ment can build up and
prevent the low water cut-
off from operating.  

Reviews: