Safe Fleet Prime Design VRR3-FT31G-ST Assembly Instructions Manual Download Page 6

PRIME DESIGN, A SAFE FLEET BRAND 

 Address: 1689 Oakdale Avenue #102, West St Paul, Minnesota 55118 

 Toll Free: 1.8.PRIME.RACK 

 Fax: 651-552-1799 

 Email: [email protected] 

 Website: www.primedesign.net

TM & © 2020 PRIME DESIGN. PROTECTED BY ONE OR MORE OF THE FOLLOWING PATENT NO.’s 6427889, 6764268, 6971563, 8991889, 9415726, 9506292, 9481313, 9776476, 9796340, 10470565, 10486608 AND OTHER PATENTS PENDING

6

1

4

2

3

View From Vehicle Front 

L Post Position

Z Post Position

Fig. C

VRR-FT31G-ST BO

ASSEMBL

Y INSTR

UCTIONS–L POSTS & Z POSTS

Installer’s Note:

 This rack is labeled for L and Z Post 

installation. These will be installed with the Rotation 

open. Begin by removing the Ratcheting Handle from 

the vehicle’s cargo hold, placing it on Drive Shaft’s 

end, then opening the Right Hand Rotation.

Do not extend the Slide. It must remain 

closed for correct Slide Z Post installation.

SLIDE L POST

1.1

The Rotation Assemblies have a factory attached L and Z 

Post positioning label. Refer to this label for initial Slide L 

Post assembly position.

1.2

Place the Slide L Post into the bottom groove of the Rear Slide 

Assembly, ensuring the L Post seats into the Slide’s outer 

bottom groove as seen in Figure C below.

INSTALLATION SEQUENCE

SEE QUICK START GUIDE FOR ADJUSTMENTS

Summary of Contents for Prime Design VRR3-FT31G-ST

Page 1: ......

Page 2: ... PATENT NO s 6427889 6764268 6971563 8991889 9415726 9506292 9481313 9776476 9796340 10470565 10486608 AND OTHER PATENTS PENDING 2 1 6 4 2 5 3 6 5 6 2 4 3 1 7 5 1 6 4 3 6 2 VRR FT31G ST BOX ASSEMBLY INSTRUCTIONS PACKAGING CONTENTS CONTENTS OVERVIEW STB 0001 Ship Thru Box Installer s Note This fully built ladder rack illustration cross references with the STB 0001 Ship Thru Box illustration shown b...

Page 3: ... ST BOX ASSEMBLY INSTRUCTIONS PACKAGING CONTENTS 4 Z Post Bracket Assembly Qty 2 Front Adjustable 1 L Post Assembly Qty 2 Slide Rear G2 Sq Cap Bottom Mount 9 25 2 Z Post Qty 4 Front and Rear Adjustable 6 50 Padded 6 HKT 0131 Qty 1 Telescoping Low Profile Hardware Anti Seize 1X M8 x 20MM 2X M8 Lock Nut 2X Flat Washer 4X 3 L Post Assembly Qty 2 Front Low Profile Sq Cap Top Mount 8 50 5 Z Post Bracke...

Page 4: ...NDING 4 VRR FT31G ST BOX ASSEMBLY INSTRUCTIONS PREPARATION RECOMMENDED ASSEMBLY TOOLS NOT INCLUDED Combination Wrench 13MM Can be used for general assembly then followed with Torque Wrench Torque Wrench inch pound 3 8 drive Must use for Rotation deployment Installer s Note Do not use power tools to tighten fasteners Power tools may lead to overtightening and cause damage to the vehicle or the Ladd...

Page 5: ... 13MM socket and loosen the four Barrel Nuts in positions A two full turns counterclockwise 0 1 ROTATION DEPLOYMENT Installer s Note The Rotations on this Ship Thru rack are factory mounted inboard of the Crossbar ends They must be repositioned to the Crossbar s end stops for proper operation and use A A A A Grasp the Drive Shaft in the shaded areas then evenly pull the Rotation outward to a hard ...

Page 6: ...ler s Note This rack is labeled for L and Z Post installation These will be installed with the Rotation open Begin by removing the Ratcheting Handle from the vehicle s cargo hold placing it on Drive Shaft s end then opening the Right Hand Rotation Do not extend the Slide It must remain closed for correct Slide Z Post installation SLIDE L POST 1 1 The Rotation Assemblies have a factory attached L a...

Page 7: ...ttom groove of the Slide Assembly then position it into the L Post Bracket Assemble the Slide L Post hardware but do not tighten until Step 1 4 Note The orientation of the bolt hole faces away from the Slide Upper Lightly tighten the Slide L Post bolt then finalize the alignment of the front edge of the Slide L Post as shown below in Figure D This must align to the label s L Post positioning arrow...

Page 8: ... Locknut Flat Washer VRR FT31G ST BOX ASSEMBLY INSTRUCTIONS L POSTS Z POSTS 2 3 2 4 Torque to 90 in lbs Place the T Bolt into the notched portion of the Front Crossbar 3 1 3 2 Slide the T Bolt toward the right Rotation Base Assembly FRONT L POST Assemble the Front L Post onto the Crossbar and T Bolt using the hardware shown below Do not tighten until Step 3 5 3 3 Torque to 90 in lbs 3 5 Slide the ...

Page 9: ... 10470565 10486608 AND OTHER PATENTS PENDING 9 Fig H View From Vehicle Front Repeat Step 2 3 Repeat Step 2 3 Repeat Step 2 4 VRR FT31G ST BOX ASSEMBLY INSTRUCTIONS L POSTS Z POSTS FRONT Z POST 4 1 Place the Front Z Post Clamp onto the top of the Front Rotation Assembly ensuring the Z Post Clamp seats into the top groove as seen in Figure H below 4 2 Repeat Steps 2 2 2 4 to complete the assembly of...

Page 10: ...ck Start Guide found inside the Ship Thru Box and place it into the vehicle s glove box for End User ladder setup and adjustment QUICK START GUIDE LEFT SIDE INSTALLATION SEQUENCE 5 Repeat steps 1 1 1 4 to install the left side Rear Slide L Post 6 Repeat steps 2 1 2 4 to install the left side Rear Slide Z Post 7 Repeat steps 3 1 3 5 to install the left side Front L Post 9 Close the Left Hand Rotati...

Page 11: ...Page Intentionally Left Blank ...

Page 12: ...USAM VRRFT31GSTBOX US01 Rev A 0817 ...

Reviews: