background image

PRIME DESIGN, A SAFE FLEET BRAND 

 Address: 1689 Oakdale Avenue #102, West St Paul, Minnesota 55118 

 Phone: 651-552-8554 

 Toll Free: 1.8.PRIME.RACK 

 Fax: 651-552-1799 

 Email: [email protected] 

 Website: www.primedesign.net

TM & © 2019 PRIME DESIGN. PROTECTED BY ONE OR MORE OF THE FOLLOWING PATENT NO.’s 6764268, 6971563, 2364879, 8857689, 8511525, 8991889, 2271515, 2364897, 9506292, 9481313, 9481314, 9796340, 6202807, 6427889, 9415726 AND OTHER PATENTS PENDING

2

2

4

6

7

13

14

5

3

8

11

10

1

9

12

" Lock Washer (6X)

23” Channels (2X)

74” Channels, Pre-assembled (2X)

Channel Bracket (6X)

M8 x 20MM (6X)

M8 X 25MM (8X)

" Flat Washer (16X)

Mounting Bracket (8X)

Foam Pad (8X)

M8 Lock Nut (10X)

Anti-Seize (1X)

16

15

15

VCR3-FT31B 

ASSEMBL

Y INSTR

UCTIONS–P

A

CKA

GING CONTENTS

CONTENTS OVERVIEW

2—Rear Crossbar Assembly .................................. (Qty 1)

4—Front Crossbar Assembly ................................. (Qty 1)

3—Center Crossbar Assembly ............................... (Qty 1)

1—FBM-0095 ........................................................ (Qty 1)

  Channels w/ Hardware

5—Rear Drive Shaft ............................................... (Qty 1)

  Right Hand, B4 Version, 46.00”

6—Handle Latch Assembly ................................... (Qty 1)

  Right Hand

Summary of Contents for PRIME DESIGN VCR3-FT31B

Page 1: ......

Page 2: ...340 6202807 6427889 9415726 AND OTHER PATENTS PENDING 2 2 4 6 7 13 14 5 3 8 11 10 1 9 12 Lock Washer 6X 23 Channels 2X 74 Channels Pre assembled 2X Channel Bracket 6X M8 x 20MM 6X M8 X 25MM 8X Flat Wa...

Page 3: ...Bar Qty 1 48 00 11 Quick Clamp Tube Splice Assembly Qty 1 5 00 13 Clamp Down Handle Latch Assembly Qty 1 10 Clamp Down Tube Qty 1 104 00 12 Removable Horn with Cap Qty 1 15 00 14 Clamp Down Handle Ass...

Page 4: ...ION RIGHT SIDE ASSEMBLY SEQUENCE Prior to assembling the Channels and hardware the OEM roof holes must be chased using an M8 x 1 25 tap and fluid Doing so will ensure accurate torque is achieved Insta...

Page 5: ...sh Fig A Apply silicone sealant not provided to screws VCR3 FT31B ASSEMBLY INSTRUCTIONS RIGHT SIDE ROTATION 2 6 Position Mounting Brackets to designated dimension shown below then torque the M8 X 20MM...

Page 6: ...6 Rear Front 9 25 10 00 Rear Front Center 10 00 Fig B VCR3 FT31B ASSEMBLY INSTRUCTIONS RIGHT SIDE ROTATION REAR DRIVE SHAFT CYLINDER HARDWARE 4 1 4 2 4 3 Torque to 90 in lbs 5 1 5 2 4 4 Torque to 80 i...

Page 7: ...ROTECTED BY ONE OR MORE OF THE FOLLOWING PATENT NO s 6764268 6971563 2364879 8857689 8511525 8991889 2271515 2364897 9506292 9481313 9481314 9796340 6202807 6427889 9415726 AND OTHER PATENTS PENDING 7...

Page 8: ...p Bracket as shown then finger tighten if adjusting later or torque to 80 in lbs Ensure the Auto Clamp Spring is seated into the spring catch 10 3 Place the L Post into the bottom groove of the Rear C...

Page 9: ...o the Auto Clamp and the gap between the two is even from top to bottom 10 7 Repeat steps 10 1 10 8 for the front L Post installation 10 9 Ensure both Z Post Mounting Clamps are fully seated into the...

Page 10: ...PRIME DESIGN PROTECTED BY ONE OR MORE OF THE FOLLOWING PATENT NO s 6764268 6971563 2364879 8857689 8511525 8991889 2271515 2364897 9506292 9481313 9481314 9796340 6202807 6427889 9415726 AND OTHER PA...

Page 11: ...7889 9415726 AND OTHER PATENTS PENDING 11 35 View from vehicle front VCR3 FT31B ASSEMBLY INSTRUCTIONS LEFT SIDE CLAMP DOWN 14 4 Set Clamp Down Horn to angle shown 14 5 Torque to 90 in lbs HANDLE LATCH...

Page 12: ...E The orientation of the bolt hole faces away from the Crossbar Place the Front Hook Clamp Bracket removed in Step 16 1 into the lower groove of the Crossbar and slide it on top of the Front Ladder Ho...

Reviews: