washer (Hw2) as show
n
.
STEP 1: A
tt
ach leg (B)
and sideboard( A) by bolts(Hw1), sp
lit lock
washer (Hw3), flat
* Before beginning assembly of product, make sure all parts are present. Compare parts with part contents list and hardware contents list.
* If any part is missing or damaged, do not atempt to assemble the product.
* Es mated Assembly Time: 30 minutes.
* Tools Required for Assembly (included): Allen Key, (Not included): Phillips Screwdriver
* If you are having difficulty, our friendly Customer Care team is always here to help. Please email
PREPARATION
B
B
B
B
A
Hw1
Hw3
Hw2
Hw4
Hw6
Hw7
STEP 2: A
tt
ach door handle (Hw6) and door by
using
bolt (Hw7)