background image

PREPARATION

Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware
contents list.  If any part is missing or damaged, do not attempt to assemble the product.

2/2

contents list.  If any part is missing or damaged, do not attempt to assemble the product.
Estimated Assembly Time: 6 minutes.

PLEASE USE TYPE"G" BULB MAX 25-WATT OR LED BULB MAX 5W-WATT
THERE ARE 6PCS LED 2-WATT LED BULBS IN THE BOX

Step 1
Screw the bottom threaded portion of the  Tube (B) into the Base (C)
Screw the Lamp Body (A) into the top threaded portion of the Tube (B)

Screw the bottom threaded portion of the  Tube (B) into the Base (C)
Screw the Lamp Body (A) into the top threaded portion of the Tube (B)
Insert the Bulbs (D) into sockets

Be careful not to twist the power cord and tighten securely

ENJOY YOUR LAMP

2/2

Reviews: