background image

2. Stand the assembled base onto a flat surface

3. Insert tube (H) into tube(G) 

4. Insert tube (I) into tube(H) 

5. Insert Arm (M) into tube(I) and secure with thumb screw(J)

6. Insert arm (N) into arm(M) 

7. Insert arm (Y) into arm(N) 

8. Insert metal (X) into arm(Y) and secure with screw(W)

9. Put shade(P) onto socket(O) and secure it with socket ring(Q),

 insert 23W CFL bulb(R)-(INCLUDED)

10. Put PS panel(S) onto the shade(P) and secure it with Finial(T)

11.Insert arm(L) into arm(M).

12.Inset wood(K) into arm(L).

ENJOY YOUR LAMP

PREPARATION

Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware
contents list.  If any part is missing or damaged, do not attempt to assemble the product.
Estimated Assembly Time: 15 minutes.

1. Insert tube(G) to the base(D) and steel plate(E), then secure by
flat washer(C).plat mat(B) and hex nut (A) using wrench key(Z)-INCLUDED

Reviews: