PREPARATION
* Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware contents list.
* If any part is missing or damaged, do not attempt to assemble the product.
* Estimated Assembly Time: 6 minutes.
* If you are having difficulty, our friendly Customer Care team is always here to help. Please email [email protected]
NOTE: PLEASE USE ON/OFF TYPE"A" BULB MAX 60-WATT OR LED BULB MAX 9-WATT, THERE ARE 2PCS LED 9-WATT BULB IN THE BOX
Step 1:
Pull power cord to connect the Neck (B) to the Base (A).
Screw the Neck (B) with socket assembly (C)onto the Lamp base (A).
Be careful not to twist the power cord and tighten securely
Step2:
Insert the Pole (D) into the Socket assembly(C).
Put the shade(E) on the Pole(D),then tighten the Finial
(F)into the Pole (D). Insert the bulb(G) into the
socket(C).
Step3:
Put the light on a level surface to check if
everything is stable.
2/2