PREPARATION
*Before beginning assembly of product, make sure all parts are present. Compare parts with part contents list and hardware contents list.
*If any part is missing or damaged, do not a�empt to assemble the product.
*Es�mated Assembly Time: 60 minutes.
*Tools Required for Assembly (included): Allen Key
*If you are having difficulty, our friendly Customer Care team is always here to help. Please email
15
15
14
13
14
STEP5
: A�ach Back Board (J) and Insert List Joint (HW25) in between.
Insert Screw Cap (HW22) posi�on as the above image.
STEP6
: Con�nue by a�aching Bo�om Board (B)
into the assembled components from step 5.
secure with Screw M7x50mm (HW5) using Allen Key (HW8).
STEP7
: Insert Support Corner Brace (HW17) and place it inside Leg (HW15)
tube.Insert Screw (HW7) into the hole of Corner Brace (HW16). Screw in slightly
just enough to grip Leg (HW15) with Support Corner Brace (HW17) inside
Do not �ghten. Arrange Support Metal Leg 1 (HW13) &
Support Metal Leg 2 (HW14) on the floor as per image.
STEP8
: Install the prepared Leg (HW15). Ensure the Corner Brace
(HW16) hooks onto the hole of Support Metal Leg (HW13) and (HW14).
Screw in just enough to grip the support using Allen Key (HW8).
Do not fully �ghten. Repeat for the other legs
Laminated
Laminated
Laminated
Laminated
25
25
J
J
J
J
22
B
5
8
15
16
7
8
15
17
17
15
15
14
13
16
±2 mm