Before beginning assembly of product, make sure all parts are present. Compare parts with
part contents list and hardware contents list.
If any part is missing or damaged, do not a�empt to assemble the product.
Es�mated Assembly Time: 60 minutes.
PREPARATION
19
16
13
6
19
15
15
19
STEP1
: Insert Cambolt (HW1)into Top Board (A).
Insert Dowel (HW4) into Side Board Le� (C), Side Board Right (D) and
Center Board (E).
STEP2
: A�ach Side Board Le� (C), Side Board Right (D) and
Center Board (E),into Top Board (A) .
Insert Camlock (HW2) then �ghten using screwdriver.
Put Screw Cap (HW3) over the camlock.
Step3
: Insert Back Boards (G) as figure. Put Bo�om Board (B)
and secure with Screw M7x50 mm (HW5),
�ghten screws using Allen Key (HW6).
STEP4
: Insert Support Corner Brace (HW15) and place it inside Leg (HW19)
tube.Insert Screw (HW13) into the hole of Corner Brace (HW16). Screw in slightly
just enough to grip Leg (HW19) with Support Corner Brace (HW15) inside
Do not �ghten. Arrange Support Metal Leg 1 (HW17) &
Support Metal Leg 2 (HW18) on the floor as per image.
1
4
4
4
A
C
D
E
D
C
E
A
2
3
18
18
16
16
17
17
19
19
19
16
19
B
G
Laminated
Laminated
G
5
6