background image

Step 1

Step 2

Attach the rubber pads(H1)to the bottom of frame(A)

Stack up the frames(A,B,C,D) accordingly 

Step 3
Put the glass in the frame(D)

PREPARATION

Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and 
hardware contents list. 
If any part is missing or damaged, do not attempt to assemble the product.
Estimated Assembly Time: 10 minutes.

Reviews: