![SAFAVIEH COUTURE Lorna SFV2104 Assembly Download Page 2](http://html1.mh-extra.com/html/safavieh-couture/lorna-sfv2104/lorna-sfv2104_assembly_3300738002.webp)
A
B
PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware contents list.
If any part is missing or damaged, do not attempt to assemble the product.
Estimated Assembly Time:15 minutes.
Tools Required for Assembly (included):Allen key.
Step 1:
Attach 4*Leg (B) in the corresponding position on the underneath of drawer (A), by
using Allen key (HW2) to lock with 8*Allen bolt (HW1).
Wall
1
2
3
4
5
Step 2:
Straighten up the assembled server. Following the installa�on
instruc�ons of an�-�pping (HW3) to fix the server in the wall by 2 straps.
Assembly is completed.
1
2
3
4
5
1
2
HW1
HW2
HW3