![SAFAVIEH COUTURE Emerson SFV4753-K Quick Start Manual Download Page 4](http://html1.mh-extra.com/html/safavieh-couture/emerson-sfv4753-k/emerson-sfv4753-k_quick-start-manual_3277714004.webp)
PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with package contents
list and hardware contents list.
If any part is missing or damaged, do not attempt to assemble the product.
Estimated Assembly Time: 15minutes.
Tools Required for Assembly (included):
Allen key
/wrench
PREARATION
H1
Assembl the slat legs"H" with part of
Assembl the slat legs"H" with part of
Assembl the slat legs"H" with part of
Assembl the slat legs"H" with part of
HW5
HW2
HW3
HW4
STEP2
Rotate the bed legs E to the footboard C
and headboard.
STEP4
Rotate the slat legs H to the middle rod of slat
G. Put it inside the middle of the bed, And then,
smooth the slat F inside the bed
H
G
F
C
E
E
STEP3
Attach the sideboard D with headboard and
footboard(Step2) by sliding the iron plates onto the bolt,
the metal card should be alignment card slot when
install it,then press it lightly.
X2
X2
The legs and hardware are located inside the sideboard&slat boxs.
The legs and hardware are located inside the sideboard&slat boxs.
HW6
HW6
STEP5
Secure the slat with screw HW1 by using
wrench HW6.There are totally 9 holes on slat
to make sure it stable, it's shown in step 4
It's finished as shown,Your Bed is
ready for use.
STEP1
Open the velcro on the headboard A
,
attach the ear
of headboard B to the headboard A by using allen key
H
W
5
and hardware
H
W2
,
H
W3
,
H
W
4
as shown
,
tighten until
secure
,
Then smooth the velcro.
B/L
B/R