
11
8. Packaging
Your first impressions are important to us ! The packaging of your new stove offers
exceptional protection against damage. However the stove and its accessories can
still be damaged in transit.
So please check the stove for damage and missing components when you take
delivery of it. Notify your supplier immediately of any missing components and also
on the CMR document.
The packaging for your stove is harmless for the environment. The cardboard and
the plastic foil an be returned to the local waiste facility for recycling.
9. Installing the stove
All local regulations, including national and European standards must be followed when
the appliance is installed.
Only an appliance connected by a recognised installer guarantees compliance with
legislation on construction and fire prevention. This is certainly required for safe and
proper use of the stove.
The stove may only be installed on a floor with adequate load-bearing capacity. If the
floor is non-compliant, then steps will have to be taken to increase the load-bearing
capacity.
9.1. The chimney
Before a stove is connected to a chimney connected is, the size and quality of the
chimney must be checked to ensure that they meet locally applicable regulations.
The measurements may need to be calculated.
The chimney must be cleaned yearly. This cleaning must take place in
compliance with local legislation in force.
9.1.1. Chimney tips:
The stove can be connected directly to the chimney. The diameter of the outlet
pipe must match the diameter of the connector pipe on the fireplace.
We can guarantee that the appliance will work well if there is a hearth draught of
between 10 and 20 Pa. The hearth draught can only be determined when the
appliance is lit! If the chimney draws too strongly, then a damper must be
incorporated.
English