
6
INSTALLATION / PRIMING
Fill the tank with fresh water.
Move the ON/OFF switch to
“I” to turn on the machine.
The display will signal that
the machine is warming
up.
Place a container under
the steam wand.
Open the knob to prime the
machine.
Wait until a steady stream
of water flows out from the
wand.
The machine is ready for
use.
Fill the coffee bean con-
tainer with coffee beans.
Remove the drip tray from
the box and put in place on
the machine.
Insert the plug into a sui-
table outlet.
Close the knob to stop the
flow of water. Remove the
container.
See rating plate
Press the hot water button.
HOT WATER
WARMING UP...
RINSING
WARMING UP...
SELECT PRODUCT
READY FOR USE
HOT WATER
WARMING UP...
Press the hot water button
again to turn off the hot water
feature. Wait for machine to
reach coffee temperature.
Note: Prime the machine
during initial set up, if the
machine has not been
used for several days, after
refilling the water tank, or
any time the display reads
“VENTILATE”
.
The messages displayed by the machine during operation are shown
on page 18.
The “Aqua Prima” filter can
be installed (see pg.11).
Allow to soak for 30 minutes
prior to first use.
Important warning for using the “Aqua Prima Filter” can be found at
page 18.