INSTALLATION / VENTILATE
Fill the coffee bean container
with coffee beans.
Fill the tank with fresh drin-
king water.
Move the ON/OFF switch to
“I” to turn on the machine.
Insert the plug into a sui-
table electric socket.
See rating plate
Place a container beneath
the steam wand.
Note: You must load the circuit before starting up the
machine for the fi rst time, if it has been inoperative for a
lengthy period or if the water tank has been completely
emptied. Moreover, the circuit must be loaded every
time the message
“VENTILATE”
is displayed.
Turn the knob countercloc-
kwise to start loading the
circuit.
Wait until a steady stream
of water fl ows out from the
nozzle.
Turn the knob clockwise
to terminate the circuit-
loading process.
The machine is ready for
use.
Remove the container.
The “Aqua Prima” fi lter can
be installed (see pg.31).
SELECT PRODUCT
READY FOR USE
The messages displayed by the machine during operation are shown
on page 40.
Important warning for using the “Aqua Prima Filter” can be found at
page 40.
HOT WATER
��
VENTILATE
A message is displayed
indicating that the machine
circuit needs loading.
A message is displayed
indicating that the machine
circuit has been loaded.
26
Summary of Contents for Incanto de Luxe
Page 142: ...OPMERKING 142...
Page 143: ...OPMERKING 143...