
9
Installation
3 .
Move the head so that the level bubble is central. Tighten the tie
down, release the horizontal brake and check the level bubble
remains central.
Converting the Head Into a Flat Base
1 .
Unscrew the centre tie down stud (retain for future use) to make a
flat base for a Pedestal or Slider.
8 mm maximum
!
CAUTION! Risk of damage .
When fitting
Pin, maximum thread length is 8 mm.