![Saba HD600-BOX-90 Manual Download Page 31](http://html1.mh-extra.com/html/saba/hd600-box-90/hd600-box-90_manual_3161428031.webp)
Installation
WALL DRILLING AND BRACKET FIXING
Vertical reference line
As a first step, proceed with the following lines drawings:
• A vertical line up to the ceiling or up to the upper limit, at the
center of the area in which the hood is to be fitted�
• A horizontal line
A
at
950 – 1050
mm above the cooker top�
• A horizontal line
B
at a
229
mm above the horizontal line A�
• A horizontal line
C
at a
50-450
mm above the horizontal line
B�
29
GB
(1)
80
80
60
60
60
60
950-1050
A
B
C
(2)
(3)
229
50-450
Summary of Contents for HD600-BOX-90
Page 2: ......
Page 39: ...P N 16173000A11831...