background image

 

3

 
SINGLE POST BASKETBALL PARTS LIST 

 

 

 
 

ASSEMBLY INSTRUCTIONS 

 
1.  Begin by locating the frame assembly and the 
horizontal support tube as shown in 

FIGURE 1

.  

Attach the horizontal support tube to the frame 
assembly with the stainless steel split tees and 
hardware as shown in 

FIGURE 2

 

 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
2.  Align the two holes in the top of the backboard with the 
holes in the horizontal support tube as shown in 

FIGURE 3

 .  

Insert the  5/16” x  4” cairrage bolts into each hole in the 
backboard and through the horizontal support tube.  Thread 
a hex nut onto the end of the carriage bolt that passes 
through the backside of the horizontal support tube.  Do not 
tighten the hex nuts all the way down at this point.

 

 

 

 
 
 

ITEM # 

PART # 

DESCRIPTION 

QTY.

 

20-185 

Frame Assembly  

1 ea. 

7-182 

Horizontal Support Tube 

1 ea. 

2019061 

Split “T” Half  

2 ea. 

2020049 

3/8”-16 x 2 1/2" S/S Carriage Bolt 

2 ea. 

5-139 

3/8”-16 Hex Nut S/S 

2 ea. 

5-309 

5/16”-18 x 2 1/2” Hex Head Flange Bolt  

4 ea. 

05-33-114 

7/16” x 1” Flat Washer 

8 ea. 

SPG-104A 

Basketball Rim, Backboard (and Net Not Shown) 

1 ea. 

05-33-115 

5/16”-18 Hex Flange Nut 

4 ea. 

10 

5-310 

5/16”-18 x 4” Carriage Bolt S/S 

2 ea. 

11 

2022650 

5/16”-18 Hex Nut S/S 

2 ea. 

12 

4-102 

Expandable Collar, Anodized Aluminum 

1 ea. 

13 

5-109 

1/4”-20 x 1/2" BTNHD Cap Screw 

1 ea. 

14 

5-108 

1/4”-20 x 1/4" Nylon Tipped Set Screw 

2 ea. 

15 

AS-100D / 100P 

Anchor Socket, 1.90” Diameter x 6” Deep  

(Either the Plastic Or Bronze  anchor are used for this assembly)

 

1 ea. 

FIGURE 2 

FIGURE 3 

Reviews: