background image

0

2

S-Energy

 

PV Module Installation Manual

Safety Precautions

2.

CAUTION

CAUTION

RECOMMENDATION

Store a module in an indoor warehouse before 
installing.

The utmost care is required for preventing corrosion/
contamination/deterioration due to mishandling 
when you load/outdoor load/installation.

Working on a PV system requires following all 
applicable local codes and wearing protective 
equipment, and must be performed by appropriately 
qualified and authorized personnel only.

Always wear protective equipment while working 
with PV modules.

Do not place heavy objects on the module.
Stepping on or allowing objects to fall on the module  
may damage certain parts of the product and slow 
down the performance significantly, or causes risks to 
the whole system.

Install when the weather is clear.

Do not install when snowy, rainy, and windy days.
Do not install where water remains on the ground.

All surfaces and corners are fragile, so touch only 
the frame areas when moving/installing. And do not 
allow direct shock or  hit to the module. 

PV module should be installed by a two person team. 
Be careful when handling because the shock may 
cause damage or low performance.

These “Safety Precautions” should be thoroughly understood before installing.

  

※ 

PV module installation should be performed by qualified person only.

Do not step, stand or sit on the

modules to install and clean.

DANGER

CAUTION

When connecting with '+', '-' in module, the cable shall be equipped with direct current, and shall not connect or 
disconnect with module when electricity flows. If an abnormal or old electrode is connected, you may get injured by 
sparks arising from direct current.

Summary of Contents for SC Series

Page 1: ...EN ver 1 0_2019 Copyright 2019 S Energy all rights reserved INSTALLATION GUIDE SC SERIES 1 000V ENHANCED PID ENVIRONMENT RESISTANCE MECHANICAL LOAD 5 400 Pa HAIL IMPACT TEST 25 m s...

Page 2: ...S Energy PV Module Installation Manual 0 0 2019 09 23 1st edition Rev history...

Page 3: ...onsiderations 4 Caution before Installation 5 Caution when Installed 6 Electrical Installation 7 Grounding Method 8 Mechanical Installation 9 Maintenance 10 Cleaning Instructions 11 Detailed Module Sp...

Page 4: ...hall be based on this manual and the actual installation use operation and maintenance should be performed by qualified personnel with electrical license For the detailed quality warranty policy of th...

Page 5: ...y or causes risks to the whole system Install when the weather is clear Do not install when snowy rainy and windy days Do not install where water remains on the ground All surfaces and corners are fra...

Page 6: ...use performance degradation due to solar cell degradation Do not touch or give shocks to the Junction box as well as front and rear surface of module and do not remove the label Prohibited taking J bo...

Page 7: ...wledge for the PV module should not approach to the PV module Touch or approach may cause serious injury in which case manufacturer is not responsible for the damage therefrom PV module s orientation...

Page 8: ...the module with hardware that has been tested and evaluated with the module under this standard or by a field inspection certifying that the installed module complies with the requirements of UL 1703...

Page 9: ...may be used for grounding connections in accordance with the instructions provided with the module The grounding clip assembly consists of a slider base and self captivating thread cutting screw or 1...

Page 10: ...of module installation site is limited by the minimum and maximum temperature as shown below Considerations when temperature rises output is reduced due to characteristics of the module Maximum opera...

Page 11: ...frame hole passed a mechanical load test item in accordance with the IEC 61215 and UL 1703 standard and S Energy Co Ltd recommends the following method of installing a frame hole As described in fig...

Page 12: ...iron glass and the ARC glass to minimize with light reflection Cleaning time is taking into account the thermal shock and power generation please proceed early in the morning and cloudy weather Clean...

Page 13: ...97 V 18 96 325 W 33 60 V 9 68 A 325 W 10 11 A 41 11 V 19 26 40 to 85 1 000V A 20 0 3 Rated Power Pmax Voltage at Pmax Vmp Current at Pmax Imp Warranted Minimum Pmax Short Circuit Current Isc Open Cir...

Page 14: ...S Energy PV Module Installation Manual 1 Hole installation method Installation Instructions 12 11 2 Location and method of clamp installation...

Page 15: ...the frame Be sure to avoid shadowing effects from the module clamps When choosing this type of clamp mounting method use at least four clamps on each module two clamps should be attached on each long...

Page 16: ...ergy com en H E A D O F F I C E C O N T A C T Fl3 MiraeAsset Tower 20 Pangyoyeok ro 241 beon gil Bundang gu Seongnam Gyeonggi do 13494 Republic of KOREA Tel 82 70 4339 7100 Fax 82 70 4339 7199 E mail...

Reviews: