
Pre-trip Inspection
•
Before each day’s operation,
the EZ Track 4100 must be
inspected by the operator.
•
Do a visual inspection to check
for lose, worn, missing or
broken parts such as bolts,
broken parts such as bolts,
nuts, wires & retaining pins.
a.
Check hydraulic hoses for
cuts, wear, loose
connections.
b.
Check engine and hydraulic
system.
Summary of Contents for EZ Track 4100
Page 1: ...EZ Track 4100 Training Procedure Manual...
Page 24: ...Auger Operation Procedure...
Page 36: ...Bucket Assembly Standard Operating Procedure Operating Procedure...
Page 40: ...Hydraulic Pole Guide Procedure Procedure...
Page 41: ...1 Slide pole guide in to receiver of sheave head 2 Install and secure pin...