![Ryobi RLM16E36S Original Instructions Manual Download Page 8](http://html1.mh-extra.com/html/ryobi/rlm16e36s/rlm16e36s_original-instructions-manual_1505167008.webp)
Keep the supply flexible cord
away from the cutting blades.
Press the Start button and then
the On-off button (A or B) to
start the product. Release the
Start button and keep pressing
the On-off button to run the
product. Release the On-off
button to stop the product.
Go
Stop
Class II tool, double insulation
Waste electrical products
should not be disposed of
with household waste. Please
recycle where facilities exist.
Check with your local authority
or retailer for recycling advice.
Regulatory Compliance
Mark (RCM). Product
meets applicable regulatory
requirements
.
The guaranteed sound
pressure level is 81 dB.
The guaranteed sound power
level is 94 dB.
The following signal words and meanings
are intended to explain the levels of risk
associated with this product:
DANGER
Indicates an imminently hazardous situation,
which, if not avoided, will result in death or
serious injury.
WARNING
Indicates a potentially hazardous situation,
which, if not avoided, could result in death or
serious injury.
CAUTION
Indicates a potentially hazardous situation,
which, if not avoided, may result in minor or
moderate injury.
CAUTION
(Without safety alert symbol) Indicates a
situation that may result in property damage.
SYMBOLS IN THIS MANUAL
Connect to power outlet.
Disconnect from power outlet.
Parts or accessories sold
separately
Keep hands away from blades
Note
Warning
Stop the product.
6
Summary of Contents for RLM16E36S
Page 1: ...ORIGINAL INSTRUCTIONS Electric Lawn Mower RLM16E36S...
Page 9: ...RLM16E36S x 1 x 1 x 1 x 2 x 2 GO STOP x 1 x 1 13mm 7 UNPACKING...
Page 11: ...1 2 2 2 1 1 3 9 GETTING STARTED...
Page 12: ...5 3 3 2 2 4 1 4 1 4 2 3 7 8 10 GETTING STARTED...
Page 13: ...1 2 6a GO STOP 1 2 6b 1 2 A B A B A B 9 11 GETTING STARTED GETTING STARTED...
Page 14: ...12...
Page 15: ...GO STOP p 17 p 15 p 16 p 17 p 18 p 18 13 OVERVIEW...
Page 16: ...GO STOP p 21 p 19 p 22 p 23 14 OVERVIEW...
Page 17: ...15 Max 15 1 4 2 3 5 2 A B D A 1 A B B 1 2 15 OPERATION...
Page 18: ...15 Max 15 1 4 2 3 5 2 A B D A 1 A B B 1 2 16 OPERATION...
Page 19: ...GO STOP 1 2 1 2 3 1 3 2 1 2 2 2 1 1 17 OPERATION...
Page 20: ...3 2 4 5 1 18 OPERATION...
Page 21: ...1 2 3 1 2 4 19 OPERATION...
Page 23: ...21 MAINTENANCE...
Page 24: ...22 MAINTENANCE 1 3 2 GO STOP GO STOP 1 2 GO STOP...
Page 25: ...3 1 2 3 4 2 1 1 2 23 STORAGE...
Page 26: ...20170705v1 24 STORAGE 6 1 2 5...