background image

3

FEATURES

Figure 1

A. Keyless chuck
B. Trigger
C.

Direction of rotation selector (Forward/Reverse)

D. Screwdriver bits
E. Battery pack
F.

Depth gauge Rod

G. Auxiliary handle

Figure 2

A. Battery pack
B. Latches
C.

Depress latches to release battery pack

Figure 3

A. Auxilary Handle
B. To Tighten
C. To Loosen

Figure 4

A. Drill bit
B.

Depth Gauge Rod

C. Drilling Depth

Figure 5

A.

To Decrease torque

B.

To Increase torque

C.

Torque adjusting Ring

D. Drill mode
E. Impact mode

Figure 6

A.

Forward / Reverse selector

B. Reverse
C. Forward
D. Switch

Figure 7

A. Unlock (release)
B. Chuck
C. Drill bit
D. Chuck jaws
E. Lock (tighten)

Figure 9

A. Battery Charger
B. Green Light
C. Red
D.    Yellow and green

Light

OPERATION

LED FUNCTION OF CHARGER

See Figure 9.

LED WILL BE ON TO INDICATE STATUS OF CHARGER
AND BATTERY PACK:

Red LED on = Fast charging mode.
Green LED on = Fully charged battery pack.
No LED on = Defective charge or battery pack.

CHARGING YOUR BATTERY PACK

The battery pack for your tool has been shipped in a low
charge condition to prevent possible problems.
Therefore, you should charge it prior to use.

Note:

Batteries will not reach full charge the first time

they are charged. Allow several cycles for them to
fully charge.

TO CHARGE

Charge battery pack only with the charger provided.
Make sure power supply is normal house voltage,
240 volts, 50 Hz, AC only.
Connect charger to power supply.
Place battery pack in charger. Align raised rib on
battery pack with groove in charger.
Press down on battery pack to be sure contacts on
battery pack engage properly with contacts in charger.
When properly connected, red light will turn on.
When your battery pack becomes fully charged,
the red light will turn off and the green light will turn on.

After normal usage, 1 hour of charge time is required
to be fully charged.

When yellow and green lights "ON" indicates control
charge or possible faulty battery.

A minimum charge time of 1 to

1-1/2 hours is required to recharge a completely
discharged tool.
DO NOT place charger in an area of extreme heat or
cold. It will work best at temperatures above 10ºC
and below 38ºC.

IMPORTANT INFORMATION FOR RECHARGING HOT
BATTERIES

When using your tool continuously, the batteries in your
battery pack will become hot. You should let a hot battery
pack cool down for approximately 30 minutes before
attempting to recharge.

TO INSTALL BATTERY PACK

Lock switch trigger on your drill by placing the
direction of rotation selector in centre position.

See Figure 6.

Summary of Contents for CID1823VK

Page 1: ... cared for the drill driver will give you years of rugged trouble free performance WARNING To reduce the risk of injury the user must read and understand the operator s manual before using this product Thank you for buying a Ryobi product OPERATOR S MANUAL 1 2 in 13 mm THREE SPEED CORDLESS HAMMER DRILL MODEL NO CID1823VK SAVE THIS MANUAL FOR FUTURE REFERENCE 1 5 ...

Page 2: ...1 5 1 5 1 5 1 5 F Fig 1 Fig 2 Fig 3 Fig 4 Fig 5 G A B C D E A B C A B C C B A E D A B C ...

Page 3: ...1 5 Fig 6 Fig 7 Fig 8 Fig 9 A C D B C A D E B D C A B ...

Page 4: ...rts mounting and any other conditions that may affect its operation A guard or other part that is damaged should be properly repaired or replaced by an authorized Ryobi service agent unless otherwise indicated in this instruction manual Have defective switches replaced by an authorised Ryobi service agent Do not use the tool if the switch does not turn it on and off Avoid accidental starting Be su...

Page 5: ...of fire and electric shock If extension cord must be used make sure a That pins on plug of extension cord are the same number size and shape as those of plug on charger b That extension cord is properly wired and in good electrical condition Do not operate charger with a damaged cord or plug If damaged have it replaced immediately by an authorised Ryobi service agent Do not operate charger if it h...

Page 6: ...me they are charged Allow several cycles for them to fully charge TO CHARGE Charge battery pack only with the charger provided Make sure power supply is normal house voltage 240 volts 50 Hz AC only Connect charger to power supply Place battery pack in charger Align raised rib on battery pack with groove in charger Press down on battery pack to be sure contacts on battery pack engage properly with ...

Page 7: ...arbide tipped bits and select impact mode when drilling in hard material such as brick tile concrete etc CAUTION The impact drill is not designed for reverse hammering Failure to obey this caution may result in property damage TRIGGER See Figure 6 T o turn your drill ON depress the trigger T o turn it OFF release the trigger VARIABLE SPEED This tool has a variable speed switch that delivers higher...

Page 8: ...he drill to tighten chuck jaws on drill bit Chuck body could slip in your hand or your hand could slip and come in contact with rotating drill bit This could cause an accident resulting in serious personal injury MAINTENANCE WARNING When servicing use only identical replacement parts Use of any other part may create a hazard or cause product damage Avoid using solvents when cleaning plastic parts ...

Page 9: ...s under normal use and reasonable care in the opinion of the Company and such guarantee does not cover damage malfunction or failure resulting from misuse neglect abuse or used for a purpose for which it was not designed or is not suited and no repairs alterations or modifications have been attempted by other than an Authorised Service Agent This guarantee will not apply if the tool is damaged by ...

Reviews: