Step 9 

 

Step 10 

 

 

 

Using you assistants, lift the assembled frames into 
the vertical position as shown. 

 

Drop the first rafter into position into the slots at 
each end of the posts/runners, adjusting the 
positioning of the frames if necessary. If the joint is 
tight you can use a mallet or hammer with wood 
block to gently tap the rafter down into place. 

Step 11 

 

Step 12 

 

 

 

Add the second rafter to the other end of the frames 
in the same fashion as before. 

 

Now add the Pedestal panels to the bottom of each 
post as shown. Line up each panel on the post so that 
it is flush with the bottom face and secure each one 
into place with 4 x 65mm screws. 

 

 

 

Summary of Contents for Premium Pergola

Page 1: ...urface if possible with sufficient space You will also require the assistance of up to 2 adults to complete assembly safely Please note For a free standing pergola you can remove up to 600mm from the bottom of each post prior to commencing construction Package contents Tools required Items Quantities in brackets are for 6 post version 4 x Corner posts 2 x Intermediate posts 2 x Runners 6 x Rafters...

Page 2: ...emoving the appropriate amount from the bottom of each post Now lay out the 4 posts and 2 runners in the area where the pergola is to stand as shown Try to space the feet of the posts apart by approximately the length of one rafter Step 3 Step 4 Slide the runner into the post making sure the pre drilled hole is uppermost the slots in the post and runner are perfectly aligned and that the post is a...

Page 3: ...r and centrally on the post before securing into place with a 100mm coach screw at each end of the brace Step 7 Step 8 Repeat steps 4 7 for the remaining 3 posts For a six post version line up the intermediate post with the mid point pencil lines on the runner slot into place ensuring it is at 90 to the runner and fix in place with 2 x 65mm screws Attach a brace either side of the post as before R...

Page 4: ...n into the slots at each end of the posts runners adjusting the positioning of the frames if necessary If the joint is tight you can use a mallet or hammer with wood block to gently tap the rafter down into place Step 11 Step 12 Add the second rafter to the other end of the frames in the same fashion as before Now add the Pedestal panels to the bottom of each post as shown Line up each panel on th...

Page 5: ...o 7670072 VAT No 151744027 5 Step 13 Step 14 Secure each corner with a 200m coach screw down through the rafter and runner into the post Add the remaining 4 braces using the same method as before Step 15 Step 16 aligning them again the post and underside of the rafter and fixing in place with a 100mm coach screw at each end of the brace ...

Page 6: ...the assembly is complete Step 19 Step 20 Secure each rafter with a 120mm coach screw down through the rafter into the runner at each end Your Rutland Premium Pergola is now complete We hope that you found your product quick and easy to assemble but if not and you require any further assistance or have any questions you can contact us by telephone on 01778 440803 Email info rutlandcountygardenfurni...

Reviews: