background image

Rutland Box Pergola

 

Rutland County Garden Furniture Ltd, Ashbourne House, 2 Dovecote Meadows, 

Aslackby, Sleaford, Lincs, NG34 0HZ. 

Company No: 7670072   VAT No: 151744027 

  

2

 

 

Step 1 

 

Step 2 

 

 

 

Check that you have the correct components as 
shown in the package contents, including any fixings. 

 

Lay one of the runners down (part with timber batten 
attached) with the batten uppermost. Position one of 
the posts as shown, so that it is butted against the 
batten and the top face of the post is flush with the 
top edge of the runner. Now fix the post in place 
using 2 of the 100mm coach screws and repeat for 
remaining posts and runner.  

Step 3 

 

Step 4 

 

 

 

Lay the two complete frame assemblies opposite 
each other, batten side uppermost, as shown and 
space the bottom of the opposing posts apart by a 
distance corresponding to the size of pergola you are 
constructing. e.g. 2.4 metres for a 2.4 metre pergola.  

 

Using as many assistants as necessary, lift the end 
assemblies from the runner side, up into the vertical 
position.  

 

 

Summary of Contents for Box Pergola

Page 1: ...hese instructions We highly recommend that any assembly is carried out on an open flat level surface if possible with sufficient space You will also require the assistance of 2 adults to complete assembly safely Please note For a free standing pergola you can remove up to 600mm from the bottom of each post prior to commencing construction Package contents Tools required 4 x Posts 2 x Runners 2 x E...

Page 2: ...hown so that it is butted against the batten and the top face of the post is flush with the top edge of the runner Now fix the post in place using 2 of the 100mm coach screws and repeat for remaining posts and runner Step 3 Step 4 Lay the two complete frame assemblies opposite each other batten side uppermost as shown and space the bottom of the opposing posts apart by a distance corresponding to ...

Page 3: ... and an assistant if necessary lift one of the plain Edge rafters into position so that both ends are butted up to the inner edge of the rafter and flush with its top and bottom edges as shown before using 2 x 100mm coach screws to fix it to the post Step 7 Step 8 Now repeat this process for the other end assembly adjusting its position as necessary before adding the second Edge rafter in the same...

Page 4: ...t both ends before fixing it into place with a 120mm coach screw in each end Continue adding the remaining rafters Step 11 Step 12 until they have all been added The Box Pergola construction is now complete It can remain freestanding or for more security the legs can be sunk into the ground and concreted in place We hope that you found your product quick and easy to assemble but if not and you req...

Reviews: