
Wall Mounted DoublePremium Pergola
6
Step 17
Step 18
…before adding the remaining braces, ensuring they are
flush with the post edge and rafter tops, then securing
into place with 2 x 70mm coachscrews and 4 x longer
green wood screws.
If you are building a 3-post version take the intermediate
post and manoeuvre it into position by sliding it between
the runners as shown
…
Step 19
Step 20
...lining it up with the markings on the runners as
indicated.
Use a spirit level to make sure the post is vertical and at
90 ° to the runner before fixing into place with 2
coachscrews through each runner.