Installation
Preparation & installation
Ensure that there are no electric wires, gas or water pipes in the area where holes
are to be made.
Components of the appliance may have sharp edges. Wear protective gloves.
1. Ensure that that there is an electrical plug socket within adequate distance of
the hob after it has been installed.
2. Cut out the aperture that measure 560mm by 490mm deep, in accordance
with the positioning instructions detailed on the previous page.
3. Carefully and gently lower the hob into the aperture hole that you have cut
out.
4. Fix the hob on the work surface by screwing the 4 brackets on to the underside
of hob after installation:
5. The brackets position can be adjusted to suit different thickness of work
surfaces:
For Customer Services & Spare Parts please call
0345 208 8750
Opening times: Monday - Friday 8am – 8pm & Saturday 9am – 1pm
or visit us at
www.productcare.co.uk
9