background image

  Concept 400

 

 

UM-018 Version 1.4 

21 

 

 Concept 400 end user manual 

3.3.2 Control panel – Ultrasonic humidity control 

Ultrasonic humidity control is available as an optional extra on the Concept 400. Ultrasonic humidity 
is only available at time of order and is not available as an aftermarket upgrade. Fig.12 shows the 
control panel for Concept 400 workstations equipped with ultrasonic humidity; 

Fig.12 Control panel for Concept 400 workstations with ultrasonic humidity 

 

1.

 

Power indicator. Illuminates to indicate the workstation is connected to the mains power 
supply and is switched on. 

2.

 

Chamber light switch. Press to switch the chamber light on / off. Note that the switch will 
illuminate when the chamber light is on. 

3.

 

Internal socket (optional extra). Press to switch the internal socket on / off. Note that the 
switch will illuminate when the internal socket is on. 

4.

 

Gas alarm. Press to switch the gas alarm on / off.  

5.

 

Interlock purge cycle selector.  

6.

 

Lock start. Press to start the interlock purge cycle. 

Summary of Contents for Concept 400 UM-018

Page 1: ...UM 018 Concept 400 End User Manual...

Page 2: ...iance 7 1 3 Symbols 7 1 4 Installation and relocation 8 1 5 Weight and dimensions 9 2 Gas and electrical supply requirements 10 2 1 Gas supply requirements 10 2 2 Gas regulator requirements 10 2 3 Ele...

Page 3: ...ty control 19 3 3 2 Control panel Ultrasonic humidity control 21 3 3 3 Temperature controller ultrasonic humidity controller 23 3 3 4 Port selector knob controller 23 3 3 5 Interlock inner door contro...

Page 4: ...from the workstation chamber via the interlock 33 6 3 Hand access to the main chamber 34 6 3 1 Ezee Sleeve TM overview 34 6 3 2 Entering the workstation using the Ezee Sleeves TM 35 6 3 3 Exiting the...

Page 5: ...idifier tank 46 7 2 2 Replacing an Ezee Sleeve TM 47 7 2 3 Replacing the detox and catalyst sachets 48 7 2 4 Replacing the mains plug fuse UK users only 49 7 2 5 Replacing the mains fuses 50 7 3 Servi...

Page 6: ...rogen in the anoxic mixed gas is 10 Hydrogen Only the gasses specified in this manual may be used The maximum power rating of the internal socket must not be exceeded if fitted The humidifier screw ca...

Page 7: ...108 EC 1 3 Symbols Before using the Concept 400 please ensure that you are familiar with the symbols on the Concept 400 Fig 1 explains the symbols found on the Concept 400 Fig 1 Concept 400 symbols S...

Page 8: ...ains hazardous components and must not be disposed of at a household waste site Instead it should be taken to the appropriate collection point for the recycling of electrical and electronic equipment...

Page 9: ...External height 750 mm External depth 720 mm Workstation chamber internal width 800 mm Workstation chamber internal height 480 mm Workstation chamber internal depth 500 mm Interlock internal width 120...

Page 10: ...ater than this will damage internal components of the workstation and will invalidate the warranty 2 3 Electrical supply requirements The workstation must be connected to a mains power supply A power...

Page 11: ...ower switch item 5 in fig 17 section 3 3 7 page 25 or item 7 in fig 18 section 3 3 8 page 25 Note that after switching the workstation on the commissioning cycle MUST be run before using the workstati...

Page 12: ...oor tray The Concept 400 workstation is controlled via the control panel 3 2 Component layout Please familiarise yourself with the layout of your Concept 400 workstation 3 2 1 Front view standard fron...

Page 13: ...the front view of the Concept 400 workstation with the removable front screen Fig 5 Concept 400 workstation front view with removable screen 1 Glove ports shown without Ezee Sleeves TM 2 Port entry s...

Page 14: ...Concept 400 UM 018 Version 1 4 14 Concept 400 end user manual 3 2 3 Rear view Fig 6 shows the rear view of the Concept 400 workstation Fig 6 Concept 400 workstation rear view 1 Cooling vent outlets...

Page 15: ...view of the Concept 400 workstation with the standard humidifier Fig 7 Concept 400 workstation left side view with standard humidifier 1 Condenser fan 2 Pressure relief tank cover pressure relief tan...

Page 16: ...8 Concept 400 workstation left side view with ultrasonic humidifier 1 Humidifier tank 2 Humidifier tank screw cap 3 Humidifier tank label 4 Vacuum port optional extra 5 Cable gland optional extra 6 Co...

Page 17: ...e view Fig 9 shows the right side view of the Concept 400 workstation Fig 9 Concept 400 workstation right side view 1 Interlock outer door 2 Interlock outer door knob 3 Commissioning cycle cover 4 Pow...

Page 18: ...w of the Concept 400 workstation fitted with the jar attachment option optional extra Fig 10 Concept 400 workstation right side view with jar attachment option 1 Interlock outer door knob 2 Jar attach...

Page 19: ...nnected to the mains power supply and is switched on 2 Humidistat Controls the level of humidity inside the workstation chamber 3 Condenser fan on Illuminates to indicate the condenser fan is running...

Page 20: ...Gas alarm Press to switch the gas alarm on off 17 Internal socket optional extra Press to switch the internal socket on off Note that the switch will illuminate when the internal socket is on 18 Chamb...

Page 21: ...Control panel for Concept 400 workstations with ultrasonic humidity 1 Power indicator Illuminates to indicate the workstation is connected to the mains power supply and is switched on 2 Chamber light...

Page 22: ...stem has activated 15 Gas excess Illuminates to indicate that the gas excess system has activated 16 Humidity controller See section 3 3 3 page 23 for more details 17 Interlock cycle status red Illumi...

Page 23: ...the required value the set point All temperatures are in o C For ultrasonic humidity control the red value is the actual relative humidity and the green value the required relative humidity the set po...

Page 24: ...terlock inner door control panel 1 Inner door LED indicator Illuminates to indicate when the interlock inner door is available 2 Inner door button Press to unlock the interlock inner door when availab...

Page 25: ...holder 5 On off switch 6 Power cord inlet 3 3 8 Power entry panel jar attachment option Fig 18 shows the power entry panel for Concept 400 workstations fitted with the jar attachment option Fig 18 Po...

Page 26: ...ntrol panel 1 Jar attachment option on off switch Switches the jar attachment option on off 2 Gas purge timer Controls the length of the timed gas purge 3 Manual gas purge Press and hold to inject nit...

Page 27: ...midity Note that any equipment installed in the workstation chamber must be suitable for the humidity level inside the workstation chamber If in doubt consult the owner s manual for any equipment that...

Page 28: ...humidity control To control the humidity of the workstation chamber using the humidity controller item 16 in fig 12 section 3 3 2 page 21 Referring to fig 13 section 3 3 3 page 23 To increase the humi...

Page 29: ...amber using the anaerobic indicator strips Open the interlock outer door see section 6 2 2 page 32 for more details Place the anaerobic indicator strips in the interlock Close the interlock outer door...

Page 30: ...the source of the leak has been found and corrected Open the interlock outer door see section 6 2 2 page 32 for more details Press and hold the start lock start button item 14 in fig 11 section 3 3 1...

Page 31: ...n switch Switch the workstation on by pressing the on off switch item 5 in fig 17 section 3 3 7 page 25 or item 7 in fig 18 section 3 3 8 page 25 Fill the pressure relief humidifier tank see section 7...

Page 32: ...rkstation The door lock will release and the door will move towards you The door can then be pulled down to open the door fully To close the interlock outer door push the door closed The door latch wi...

Page 33: ...n fig 12 section 3 3 2 page 21 being illuminated press the inner door button item 2 in fig 15 section 3 3 5 page 24 Slide the interlock inner door backwards to open the interlock door Move the materia...

Page 34: ...e workstation chamber via the SPES and unloading the interlock Right hand glove port only for unloading the interlock For each method of entry the glove port selector knob fig 14 section 3 3 4 page 23...

Page 35: ...e Sleeve TM Fig 22 shows this procedure Fig 22 Entering the cuffs of the Ezee Sleeves TM Repeat the procedure for the other hand if both hands are to enter the workstation chamber Press and hold the v...

Page 36: ...the Ezee Sleeves TM To exit the workstation chamber using the Ezee Sleeves TM Remove the glove port cover from the glove port cover holder Fig 23 Holding the glove port cover by the glove port cover...

Page 37: ...effect of the pressure change ENTER AND EXIT THE WORKSTATION CHAMBER SLOWLY 6 4 Single Plate Entry System SPES A SPES is provided for quick and easy direct access to the workstation chamber for loadin...

Page 38: ...25 SPES internal view 6 4 2 Using the SPES To use the SPES Undo the thumb screw on the external flap item 1 in fig 24 page 37 Whilst supporting the SPES external flap swing the thumb screw to the left...

Page 39: ...in fig 11 section 3 3 1 page 19 or item 2 in fig 12 section 3 3 2 page 21 The switch will no longer illuminate and the main chamber light will go off To switch the spotlight on press and hold the spot...

Page 40: ...on the left hand side of the workstation Fig 27 shows the cable gland Fig 27 Cable gland To use the cable gland Turn the grey collar anti clockwise counter clockwise to loosen the cable gland Remove t...

Page 41: ...cuum port Fig 28 Internal part of vacuum port When the vacuum is no longer required remove the internal vacuum hose from the vacuum port by pressing the top of the metal part of the internal section o...

Page 42: ...plied connection hose To use the jar attachment option using the timed gas purge Attach the anaerobic jar to the anaerobic jar gas connector item 1 in fig 18 section 3 3 8 page 25 using the supplied c...

Page 43: ...ume propanol in distilled water Tristel Fuse Sachet 1 sachet diluted in 3 litres of distilled water or Tristel Duo Foamer Tristel Fuse Sachets and Duo Foamer are available from Ruskinn Technology Limi...

Page 44: ...that will not scratch the front screen Take care not to lose any of the front cover knobs or washers To reinstall the front screen Place the front screen onto the mounting studs Place the front screen...

Page 45: ...k inner door control panel Wipe dry using paper towels Cleaning the interlock chamber The items inside the interlock chamber that require cleaning are o The floor o The floor tray o The ceiling panel...

Page 46: ...er open the SPES see section 6 4 2 page 38 or open one of the glove port covers see section 6 3 2 page 35 to equalise the pressure between the workstation chamber and the external environment For stan...

Page 47: ...the O ring removal Fig 31 O ring removal Remove the Ezee Sleeve TM To install an Ezee Sleeve TM Place the new Ezee Sleeve TM onto the glove port ensuring that the O ring grooves are completely covered...

Page 48: ...the sachets via the glove ports Lower the floor tray ensuring that the floor tray leg has located in the floor tray locator Remove the new sachets from their packaging Whilst lifting the floor tray a...

Page 49: ...e the plug in the mains socket Reconnect Concept 400 to the mains power supply and switch the Concept 400 on Commission the Concept 400 see section 6 1 page 31 for more details Allow the Concept 400 t...

Page 50: ...information contact your local distributor Replace the mains fuse holder The fuse holder will click when it is fully inserted Replace the plug in the mains socket Switch the Concept 400 on Commission...

Page 51: ...gineer Biennial service Biennially 2 yearly Qualified service engineer To arrange an annual or biennial service contact your local distributor Note that The biennial service includes an annual service...

Page 52: ...zee Sleeve TM Pair 260 689 Ezee Sleeve TM Medium Ezee Sleeve TM Pair 260 685 Ezee Sleeve TM Large Ezee Sleeve TM Pair 260 687 Ezee Sleeve TM Glove port seal plate assembly 262 028 Glove ports Sleeve t...

Page 53: ...or measuring the Carbon Dioxide concentration in the workstation chamber 260 1168 G100 2 G100 Geotech CO2 and O2 Analyser Independent meter for measuring the Carbon Dioxide and Oxygen concentration in...

Page 54: ...ti well plates 6 well to 96 well adjustable feet and built in level indicator Ideal for experiments with low media volumes 260 1167 JuLI fluorescent cell analyser Inverted optical microscope with touc...

Page 55: ...Plug the workstation into the mains Switch the mains power on Replace the mains fuses See section 7 2 5 page 50 for more details Replace the mains plug fuse UK users only See section 7 2 4 page 49 fo...

Page 56: ...socket If the device does not power up there is a fault with the device Consult the owner s manual for the device Contact your local distributor The LED indicators are not on 24V power supply fuse ha...

Page 57: ...e interlock inner door The interlock inner door will not close The interlock inner door is blocked The interlock inner door is stuck Check for obstructions to closing the interlock inner door and remo...

Page 58: ...acing The anoxic mixed gas supply has run out Install a catalyst sachet See section 7 2 3 page 48 for more details Replace the catalyst sachet See section 7 2 3 page 48 for more details Replace the an...

Page 59: ...e relief tank See section 7 2 1 page 46 for more details Once the cause of the leak has been fixed reset the automatic gas saver system See section 5 3 page 28 for more details The N2 low indicator is...

Page 60: ...D WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE THE IMPLIED WARRANTY OF MERCHANTABILITY OR ANY IMPLIED WARRANTY ARISING OUT OF A COURSE OF DEALING OR OF PERFORMANCE CUSTOM OR USAGE OF TRADE Ruskinn Tec...

Page 61: ...not be disposed of at a household waste site Instead it should be taken to the appropriate collection point for the recycling of electrical and electronic equipment Alternatively please contact your...

Page 62: ...uskinn com Technical support ralphs ruskinn com or lyndon ruskinn com General enquiries ruskinnoffice ruskinn com Website www ruskinn com YouTube channel http www youtube com ruskinntechnology Ruskinn...

Reviews: