background image

I - SHIP PING AND PACK ING LIST

Package 1 of 1 contains:

1 - Energy Recovery Wheel Assembly

1 - Outdoor Fresh Air Hood with Filter
1 - Outdoor Exhaust Hood with Barometric Damper
1 - Platform Support Rail
2 - Side Filler Panels
1 - Top Filler Panel

1 - Box Assembly

a) Gasketing.
b) Wiring harness
c)

Hardware for attachment to economizer.

II - SHIP PING DAM AGE

Check unit for shipping damage. Receiving party should
contact last carrier immediately if shipping damage is
found.

III - GEN ERAL

These instructions are intended as a general guide and do
not supersede local codes in any way. Authorities having
jurisdiction should be consulted before installation.

IV - RE QUIRE MENTS

When installed, the unit must be electrically wired and
grounded in accordance with local codes or, in the
absence of local codes, with the current National Electric
Code, ANSI/NFPA No. 70.

V  -  AP PLI CA TION

Energy Recovery Ventilators 

(ERV)

 are used with 15  to 20

ton rooftop units. These wheels conserve energy by mixing 
warmer air with cooler air in the following manner:

Re cov ery  Ven ti la tor  Mode

The Recovery Ventilator mode is accomplished by two
blowers providing continuous exhaust of stale indoor air
and replacement by equal amount of outdoor air. Energy
recovery is achieved by slowly rotating the energy
recovery wheel within the cassette frame work. In winter,
the wheel  adsorbs heat and moisture from the exhaust air
stream during one half of a complete rotation and gives
them back to the cold, drier intake air supply during the
other half rotation. In summer, the process is automatically

INSTALLATION INSTRUCTIONS

EN ERGY  RE COV ERY  VEN TI LA TOR

P28A-10TDW

MAY 11, 2005

PAGE 1

Patent# 5,548,970

INSTALLATION INSTRUCTIONS FOR ENERGY RECOVERY VENTILATOR (PIVOTING)

USED WITH TRANE ROOFTOP UNIT MODELS YCD/TCD 15 TO 20 TON UNITS

reversed. Heat and moisture are absorbed from incoming
fresh air supply and transferred to the exhaust air stream.
This process allows outdoor air ventilation rates to be
increased by factors of three or more without additional
energy penalty or increase in size of heating or air
conditioning systems. 

VI - RIG GING UNIT FOR LIFT ING

1.

Maximum weight of unit is —- 900 Lbs (crated).

2.

Remove crating. Then remove access panel to

retrieve box assembly. 

See Figure 1.

 Replace access

panel.

3.

All panels must be in place for rigging.

4.

Lifting lugs are supplied with the unit. Loosen machine
bolts and rotate lifting lug as shown in 

Figure 1.

 

VII  -  IN STAL LA TION

Note:

The ERV unit is equipped with a support block

that must be removed to allow the unit to change
operating modes. This block may cause damage
to system if not removed.

ACCESS PANEL

LIFTING LUGS (4)

Figure 1

ETL Certified per UL 1995
and CSA 22.2

Energy recovery COMPONENT
certified to the AHRI Air-to-Air
E n e r g y   R e c o ve r y  V e n t i l a t i o n
Equipment Certification Program in
accordance with AHRI Standard
1060-2000. Actual performance in
packaged equipment may vary.

Summary of Contents for RRS Rooftop Systems P28 Series

Page 1: ...moisture from the exhaust air stream during one half of a complete rotation and gives them back to the cold drier intake air supply during the other half rotation In summer the process is automatical...

Page 2: ...s per the field wiring harness diagram provided in this installation instructions Remove the wires that were connecting the enthalpy control of the economizer and replace them with purple and blue wir...

Page 3: ...ase of installation and maintenance only matching up to rooftop unit with an internal economizer and connection of electrical power is required to make the system operational The concept consists of a...

Page 4: ...otors damper motor for wheel and dampers it should pivot wheel out of air stream opening fresh air dampers and a delayed exhaust blower will operate 5 Remove jumper s from low voltage terminal block T...

Page 5: ...nstall wheel segments follow steps A through E See Figure 5 Reverse procedure for segment removal A Unlock two segment retainers one on each side of the selected segment opening B With the embedded st...

Page 6: ...04 1 09 1 09 1 09 1 08 1 05 0 99 0 90 0 82 0 75 0 89 0 88 0 87 0 85 0 81 0 75 0 66 0 59 0 5 0 69 0 68 0 65 0 62 0 57 0 5 0 42 0 35 0 25 0 00 0 20 0 40 0 60 0 80 1 00 1 20 1 40 1500 1600 1700 1800 200...

Page 7: ...Air Motor Harness J150 Jack Wheel Motor Harness J151 Jack Exhaust Air Motor Harness J152 Jack Transformer High Voltage J153 Jack Field Harness J160 Jack Damper Motor J193 Jack Enthalpy Sensor K163 Co...

Page 8: ...move jumper to install field optional low ambient switch 2 Step down transformer assembly for 460 575 volt units only connect between J50 and P50 3 Move wire for different input voltage 4 Optional low...

Page 9: ...PAGE 9...

Page 10: ...PAGE 10 PLATFORM SUPPORT RAIL TOP FILLER PANEL SIDE FILLER PANEL...