background image

 

Miknetum MGR 400 

17 

7

 

Technical documentation 

7.1

 

Technical data 

Connection voltage:

 

 

400 V

 

50/60 Hz 3-phase AC / N / PE 

Power consumption:

 

 

8.9 kW 

Full-load current:

 

 

17.5 A 

Back-up fuse max.:

 

 

32 A 

Protection class:

 

 

IP54 

Ambient temperature:

   

+2 to 40 °C 

Dimensions, W x H x D:

 

2934 x 2817 x 3001 mm 

Machine weight:

 

1400 kg 

Transport weight:

 

1700 kg 

Container size:

 

400 litres 

Max. filling: 

 

300 litres 

Refrigerant: 

 

R404A, 0.76 kg  

Mixing arm speed: 

 

-25 to +25 rpm 

Tumbling arm speed:

 

0 to +25 rpm 

Vacuum:

 

0 – 95 % 

Lifting aid, load capacity:

 

400 kg 

Emission sound pressure level:

 

L

pA

 ≤ 70 dB(A)  

Measured according to:

 

DIN EN ISO 11201  
accuracy class 2  

Measured:

 

 

while idling without product, at 
maximum speed 

 
The data on the type plate principally applies; it is located at the rear 
of the machine next to the power supply line. In case of deviations 
contact the manufacturer for a written confirmation of the data!  
 
If your country requires a ground fault circuit interrupting device as 
protective measure, a ground fault circuit interrupting device (type B), 
AC/DC sensitive, must be used.  
 

Summary of Contents for MGR 400

Page 1: ...bensmitteltechnik Translation of the original instructions Miknetum Type MGR 400 R hle GmbH Beim Signauer Schachen 10 D 79865 Grafenhausen Tel 49 7748 523 11 Fax 49 7748 523 8511 www original ruehle d...

Page 2: ...Operating instructions 9 4 Cleaning instructions 11 4 1 Safety instructions 11 4 2 Cleaning agents and disinfectants 13 4 3 Cleaning procedure 13 5 Service Care maintenance repair 14 5 1 Regular care...

Page 3: ...m the mains during this process Refrigeration installer These work activities may be carried out only by a refrigeration installer Disregard may result in injuries Warning of hot surface Warning of su...

Page 4: ...tive equipment All life cycles phases Wear foot protection Wear hand protection Wear protective clothing Cleaning care maintenance dismantling Wear eye protection Use light breathing mask Care mainten...

Page 5: ...ce technician Until the corresponding parts have been repaired the supervisor must ensure that the machine or parts of the machine are under no circumstances put into operation The cleaning personnel...

Page 6: ...ng aid standard trolley support and reaching into the area of moving parts is strictly prohibited The standard trolleys provided must be used Maintenance The machine must be disconnected from the main...

Page 7: ...s Installation and commissioning of the machine may only be carried out in the presence of a R hle service technician or by persons authorised by R hle R hle GmbH Lebensmitteltechnik shall not be liab...

Page 8: ...achine The machine is connected to a three phase current outlet its data voltage amperage must agree with the specifications on the type plate of the machine The machine must be decommissioned until a...

Page 9: ...h When the drum moves automatically a 5 second starting alert horn sounds If the power fails when a user program is being executed the machine will react as follows when the power supply is reinstated...

Page 10: ...a recipe the lifting aid must therefore be moved down again When emptying the drum corresponding appropriate precautions must be taken to ensure that no person stands in the discharge area of the mac...

Page 11: ...ging position so that it can be used for any operating process The control panel may only be operated by touching it with the fingers Using any objects e g blade is prohibited 4 Cleaning instructions...

Page 12: ...d in the product data sheet of the manufacturer Personal protective equipment must be worn Cleaning with high pressure cleaners is permitted only for all outside surfaces drum drum lid and drum lid se...

Page 13: ...acidic Disinfectants Tego 2000 Tego IMC Supplier Th Goldschmidt AG Goldschmidtstr 100 D 45116 Essen Tel 49 201 1730 1 4 3 Cleaning procedure Please refer to the short instructions supplied with your m...

Page 14: ...ain permission from R hle customer service if welding or cutting work is required on the machine Make sure when working on the electrical equipment of the machine that this is only done by qualified p...

Page 15: ...trolley support h Check the drum lid holder i Check the chain lock for flawless function j Visually check the chain for wear k Visually check the steel cable for fraying 5 2 Regular maintenance Regul...

Page 16: ...er ready 6 Disposal 1 The machine contains a cooling system filled with the refrigerant R404A It must be pumped off by a refrigeration installer and must then disposed of correctly 2 The following com...

Page 17: ...eed 25 to 25 rpm Tumbling arm speed 0 to 25 rpm Vacuum 0 95 Lifting aid load capacity 400 kg Emission sound pressure level LpA 70 dB A Measured according to DIN EN ISO 11201 accuracy class 2 Measured...

Page 18: ...Miknetum MGR 400 18 7 2 Electrical circuit diagram The electrical circuit diagram of your machine is located in the electrical control cabinet and must be supplied when reselling the machine...

Page 19: ...processing machinery Basic concepts Part 2 Hygiene requirements Hygiene requirements DIN EN 60204 1 2007 06 A1 2009 10 Safety of machinery Electrical equipment of machines Part 1 General requirements...

Reviews: