Rugged Interactive
Unit 1, Callywith Gate
Callywith Industrial Estate, Bodmin
Cornwall, UK
PL31 2RQ
+
44 (0) 1726 981 123
www.rugged
-
interactive.co.uk
hello@rugged
-
interactive.co.uk
NinjaPods -
Installation Checklist
©
Rugged Interactive
2021
NinjaPods Installation Checklist
Please complete this checklist after any installation:
Check 1: Pre-power up checks.
All parts mounted to a construction capable of supporting its weight and gameplay.
☐
All fixings are tight and secure.
☐
No signs of damage, component failure and/or missing parts.
☐
No trapped and/or pinched cables.
☐
No loose cables that could become a tripping hazard.
☐
All long cables are supported at least every 50 cm.
☐
Adequate strain relief provided for connection points.
☐
Kept out of direct sunlight during the day.
☐
All electric components away from contact with water.
☐
Protective plastic sheets removed from front graphic panels.
☐
Check 2: Plug into a mains socket and power up.
Screen powers up.
☐
Display is as expected
.
☐
Pods illuminate.
☐
Check 3: Game can be launched.
Game can be launched via the quick start pods.
☐
Countdown starts.
☐
Pods illuminate and score when pressed.
☐
Live scoreboard change as pods are hit.
☐
Final score / winning player / team revealed at the end of the game.
☐