Rugged Interactive
Unit 1, Callywith Court,
Callywith Industrial Estate,
Bodmin, Cornwall, UK
PL31 2RQ
+44 (0) 1726 981 123
www.rugged-interactive.co.uk
Pro-X Elite -
Installation Checklist
© Rugged Interactive
20
21
CardioWall Pro-X Elite Installation Checklist
Please complete this checklist after any installation:
Check 1: Pre-power up checks.
Stable and secure construction capable of supporting its weight and gameplay.
☐
All fixings are tight and secure.
☐
No signs of damage, component failure and/or missing parts.
☐
No trapped and/or pinched cables.
☐
No loose cables that could become a tripping hazard.
☐
All long cables are supported at least every 50 cm.
☐
Adequate strain relief provided for connection points.
☐
Kept out of direct sunlight during the day.
☐
All electric components away from contact with water.
☐
Protective plastic sheets removed from each pod.
☐
Check 2: Plug in the electrical plug, that exits from the rear of the Pro-X, into a mains
socket to power up.
All pods light up.
☐
Sound volume is at a suitable level
*
.
☐
Touchscreen monitor is on standby - the monitor indicator light shows as red.
☐
Check 3: Wait at least 10 seconds after power up, then turn on the touchscreen - press
and hold the bottom right-hand side button on the monitor.
Monitor indicator light turns green and monitor turns on.
☐
The User Interface (UI) will display the Menu Screen (this may take up to a minute to appear.)
☐
Check 4: Select ClearOut via Quick Start pod.
Program counts down from 3 and begins.
☐
All pods active and operational.
☐
Touchscreen shows correct time and program name.
☐