Rugged Interactive
Unit 1, Callywith Court
Callywith Industrial Estate, Bodmin
Cornwall, UK
PL31 2RQ
+44 (0) 1726 981 123
www.rugged-interactive.co.uk
CardioWall
Outdoor Portrait
–
Section 2 - Installation
© Rugged Interactive
202
1
3.3 - Installation Overview
Below is an overview of the steps needed to install CardioWall Outdoor Portrait. More detail for the
process is provided in the following pages. Please read through ALL of this prior to beginning the
installation and if you are in any doubt, contact Rugged Interactive.
If you have any concerns on how or what the product is installed to, contact a structural engineer
prior to beginning the installation.
STEP 1:
Mark out mounting points.
STEP 2:
Drill necessary holes.
STEP 3:
Mount CardioWall Outdoor Portrait bottom section.
STEP 4:
Line up top section.
STEP 5:
Feed and attach cables.
STEP 6:
Mount top section.
STEP 7:
Turn on and test.
STEP 8:
Check all is secured and sealed.
STEP 9:
Stress relief cables.
STEP 10:
Enjoy your CardioWall Outdoor Portrait