Rugged Interactive
Unit 1, Callywith Court
Callywith Industrial Estate, Bodmin
Cornwall, UK
PL31 2RQ
+
44 (0) 1726 981 123
www.rugged
-
interactive.co.uk
hello@rugged
-
interactive.co.uk
BattleBaskets –
Section 2 - Installation
©
Rugged Interactive
2021
3.3 - Installation Overview
Below is an overview of the steps needed to install BattleBaskets. More detail for the process is
provided in the following pages. Please read through ALL of this prior to beginning the installation
and if you are in any doubt, contact Rugged Interactive.
If you have any concerns on how or what the product is installed to, contact a structural engineer
prior to beginning the installation.
STEP 1:
Select a suitable position for the Control Box (wall mounted, centre post, side of post).
STEP 2:
Install Control Box using the supplied mount.
STEP 3:
Install the top mount (if purchased).
STEP 4:
Install the sensor below the hoop.
STEP 5:
Connect all cables, all elements are connected to the Control Box.
STEP 6:
Check all is secured, stress relief cables.
STEP 7:
Turn on and test.
STEP 8:
Enjoy BattleBaskets