![Ruelco RQ-2 Operation Manual Download Page 2](http://html1.mh-extra.com/html/ruelco/rq-2/rq-2_operation-manual_1499080002.webp)
4)
Examine the valve body for any
damage such as burrs, nicks, etc.
Replace if damaged.
5) Examine the ball (Item 5) and seat
(Item 11) and replace if worn-out.
6) Replacement seals from a Ruelco
product repair kit are required for
proper valve performance.
It is
recommended that all seals be
lubricated before and after
installation with a high quality
silicon base grease.
7)
Lubricate the body seal (Item 2) and
install on the cap (Item 1).
8) Lubricate the shaft O-rings and
install on the spool assembly along
with the teflon back-ups (Item 10).
9) Lightly lubricate the bores in the
valve body (Item 8).
10)
Lubricate the seat O-ring (Item 3)
and install on the seat (Item 11).
11) Push the spring (Item 6) inside the
spool (Item 7) and thread the seat
(Item 11) along with the ball
(Item 5) onto the spool.
12) Push the spool-assembly (Item 7)
inside the valve body (Item 8).
13) Thread the cap (Item 1) onto the
valve body (Item 8).
V. RECOMMENDED
MAINTENANCE
PROCEDURE
INTERVAL
Operate
Manually. Every
30
days.
Disassemble, inspect and lubricate.
Yearly or as required.
Replace
all
seals.
Every
two
(2)
years
or
as
required.
ii